Lithium battery freight focus Air · Sea · Land assessment Document-first planning
Shipment Status & Support

North America · sea freight from Xiamen

Shipping from Xiamen to Port Angeles

Xiamen to Port Angeles

Taiwan Strait · East China Sea · North Pacific · Strait of Juan de Fuca

Sea corridor illustration: Xiamen to Port Angeles, United States Simplified map with a curved corridor from Xiamen via Taiwan Strait, East China Sea, North Pacific, Strait of Juan de Fuca to Port Angeles. Illustration only; not a vessel track or schedule. CHINANORTH PACIFICPACIFIC OCEAN XiamenCHINA ORIGIN Port AngelesUNITED STATES XiamenTAIWAN STRAITFUJIANTAIWANDEPARTURE AREA
  1. XiamenChina origin
  2. Taiwan Strait
  3. East China Sea
  4. North Pacific
  5. Strait of Juan de Fuca
  6. Port AngelesUnited States
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

This route runs out of Xiamen's Haicang and Songyu terminals on the Taiwan Strait, then follows a North Pacific corridor with no canal or chokepoint; at the far end is the port of Port Angeles.

The US side starts with two filings due before loading and ends with a road leg that must carry a live emergency number. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.

What we need to start

  • Xiamen export
  • Online packaging appraisal
  • HTS code 8507.60
  • ISF filer
  • Supply-chain tracing file

Route profile

What sets Xiamen → Port Angeles apart

Origin port

Xiamen (Haicang / Songyu)

Fujian's battery gateway, handling more than 90% of the province's lithium battery exports, with 10-minute online packaging appraisal for compliant products and the Taiwan Strait's winter monsoon on the doorstep.

Import country

United States

A duty line set by the exact 8507.60 code, lithium supply-chain questions under UFLPA, and ISF and AMS filings that are due before the box is loaded.

Container cranes at port facilities in Haicang, Xiamen, seen across the water on a hazy day
A loaded container ship on the horizon

Where this route gets difficult

What to watch between Xiamen and Port Angeles: 5 points

In the order the cargo meets them: at the loading port, at sea, at Port Angeles and at customs in United States.

  1. Origin port

    Energy-storage units may go on multipurpose ships

    Xiamen's energy-storage transport guide 2.0 (August 2026) notes that some ESS containers are carried on multipurpose ships and requires a pre-voyage meeting with the terminal and lashing parties. It also lists the terminals with class 9 qualification: Xiamen Hyundai terminal, Yuanhai Tongda, and Haixiang berths 7–8.

    What Anxin does: For ESS units we confirm early whether the carrier offers container-ship or multipurpose carriage, which qualified terminal is used, and who attends the pre-voyage meeting.

  2. Sea corridor

    Winter storms with hurricane-force winds

    NOAA's Ocean Prediction Center found hurricane-force winds (64 knots and above) in North Pacific mid-latitude storms in every month from October to April, peaking in December, with 15 to 23 such storms per season in its 2001–2004 records. They are not typhoons, so they do not follow the tropical calendar.

    What Anxin does: For October–April sailings we check blocking and bracing on stuffing photos before sealing and confirm the full DG data are on the manifest.

  3. Import country

    Section 301 at 25% on lithium-ion non-EV batteries from January 2026

    USTR's 2024 review moved lithium-ion batteries of HTSUS 8507.60.0020 (the 'other', non-passenger-EV line) from a 7.5% to a 25% additional duty for entries from 1 January 2026; EV traction batteries under 8507.60.0010 reached 25% in 2024. Other China-specific duties can stack on top and change with little notice, so the landed cost depends on the exact classification and entry date.

    What Anxin does: We do not give duty rulings. We make sure the invoice describes chemistry, configuration and application precisely enough for the importer's customs broker to classify it, and we flag the entry date when a vessel's arrival could straddle a duty change.

  4. Import country

    Washington battery stewardship starts in 2027

    From 1 January 2027 producers selling covered batteries or battery-containing products in or into Washington must be in an approved stewardship plan through a battery stewardship organization, or they may not sell there (RCW 70A.555). From 1 July 2027 retailers may not stock portable batteries unless the producer certifies it participates.

    What Anxin does: When cargo through Port Angeles is sold in Washington, we flag the 2027 stewardship requirement to the importer at quotation so that retailer certification is in place in time.

  5. Import country

    CPSC certificate data now filed at entry

    Since 8 July 2026, importers of consumer products that are subject to a CPSC certification requirement must electronically file the certificate data at entry; goods entered from a Foreign Trade Zone follow on 8 January 2027. Whether a battery-powered product is caught depends on the rules that apply to that product, not on the battery alone.

    What Anxin does: We ask whether the goods are consumer products that need a CPSC certificate and, if so, who files it, so that the question is settled before the goods arrive.

Locator map of Port Angeles, United StatesPort Angeles
Locator map in the same projection as the corridor map; the dot marks the listed port position (48.12°N, 123.43°W).
Containers on rail wagons next to a terminal in Vancouver

Documents & compliance

What to have ready: Xiamen to Port Angeles

Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

In Xiamen, before the box is loaded

  • For ESS: carriage type (container ship or multipurpose), class 9 terminal and pre-voyage meeting confirmed
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable

For the carrier and the voyage

  • Stuffing photos before, during and after packing, checked for blocking and bracing
  • Dangerous goods declaration with UN number (3480 / 3481 / 3090 / 3091), proper shipping name and packing instruction (P903, or P908/P911 for damaged)
  • Lithium battery mark (SP188 cargo) or class 9 labels and placards

For the importer in United States

  • HTSUS classification from the broker (8507.60.0010 vs .0020 decides the Section 301 line)
  • Importer of record and the licensed customs broker who will file the entry
  • ISF filer named; stuffing location and consolidator sent right after packing
A cylindrical lithium-ion cell held between two fingers
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Xiamen export filings, the carrier booking and the United States import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

What could go wrong from Xiamen to Port Angeles, and who acts

RiskWhereMitigationWho acts
ESS unit arrives at a terminal without class 9 qualificationXiamen portQualified terminal confirmed at bookingAnxin with the carrier
Heavy-weather damage in a winter stormNorth Pacific, Oct–AprCINS stuffing checksPacking site, checked by Anxin

Questions

Questions about shipping from Xiamen to Port Angeles

For lithium-ion batteries classified in HTSUS 8507.60.0020 and entered from 1 January 2026, USTR set the Section 301 additional duty at 25%; EV traction batteries in 8507.60.0010 have been at 25% since 2024. Other duties can apply on top. The importer's customs broker confirms the classification and total duty; we make sure the invoice gives the broker enough detail to do so.

Weather is the main risk on this crossing: NOAA recorded hurricane-force North Pacific storms from October to April, most often in December. We tighten the packing checks for those sailings.

Yes. Xiamen MSA reported 104 ESS containers of 36 tonnes each loaded for Houston in June 2026. Xiamen's ESS guide 2.0 requires a pre-voyage meeting and use of a class 9 qualified terminal.

References

Where these points come from

  1. 19 CFR 149.2 – Importer security filing: requirement and time of transmission (eCFR / CBP)
  2. Section 301 Modifications Determination (Federal Register notice, Sept 2024) (Office of the U.S. Trade Representative)
  3. Update: Certificates of Compliance and eFiling (U.S. Consumer Product Safety Commission)
  4. Hurricane force extratropical cyclones observed using QuikSCAT (Mariners Weather Log 49-1) (NOAA Ocean Prediction Center)
  5. Xiamen port energy-storage battery transport safety guide 2.0 (Fujian Provincial Department of Commerce)
  6. Xiamen MSA measures for energy-storage battery exports (Fujian Provincial Department of Commerce)
  7. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Xiamen
  5. 5ImportClearance at Port Angeles
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Xiamen → Port Angeles

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Xiamen → Port Angeles before any booking, and ask for missing battery documents first.

All destinations from Xiamen · United States ports

Workers loading cartons from pallets by hand in a warehouse

Need Xiamen → Port Angeles reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp