Xiamen (Haicang / Songyu)
Fujian's battery gateway, handling more than 90% of the province's lithium battery exports, with 10-minute online packaging appraisal for compliant products and the Taiwan Strait's winter monsoon on the doorstep.
Europe · sea freight from Xiamen
Xiamen to Figueira da Foz
South China Sea · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Ionian Sea · Sicily Channel · Strait of Gibraltar
This route runs through Xiamen, the port for more than 90% of Fujian's lithium battery exports, then follows a Bab el-Mandeb and Suez passage into the Mediterranean; at the far end is the port of Figueira da Foz.
Portugal registers battery producers with APA on SILiAmb. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
Fujian's battery gateway, handling more than 90% of the province's lithium battery exports, with 10-minute online packaging appraisal for compliant products and the Taiwan Strait's winter monsoon on the doorstep.
Mediterranean services are the ones most likely to use Suez again (57% in September 2026), which puts the cargo back through Bab el-Mandeb, rated a SUBSTANTIAL threat.


Where this route gets difficult
Listed from loading in Xiamen to import into Portugal, each with what we do about it.
Xiamen MSA offers pre-review of key DG documents, a pre-loading meeting at which ship, cargo owner, terminal and agent agree deck stowage and emergency measures, and a 'one ship, one plan' checklist from gate-in to sailing. In June 2026 it reported 104 energy-storage containers of 36 tonnes each loaded for Houston on a multipurpose ship.
What Anxin does: We send the key documents for pre-review before the formal filing and bring the stowage and emergency details the meeting will ask for.
The 43% of Mediterranean services not using the Red Sea sail round the Cape of Good Hope, then back through Gibraltar. SAMSA estimates about 200 of the 576 containers lost at sea in 2024 went overboard near the Cape, 35% of the year's total.
What Anxin does: On Cape sailings we apply the CINS blocking and bracing checks strictly on stuffing photos before sealing.
Since 18 August 2024 a battery sold in the EU needs the CE marking and an EU declaration of conformity from its manufacturer. The declaration has to be available in the language Portugal requires, and the importer is the one who must check both before the goods are released for sale.
What Anxin does: We ask the manufacturer in China for the declaration of conformity and a photo of the CE marking on the battery or its packaging before loading, and pass them to the Portugal importer. We check that the documents exist and match the goods; we do not assess conformity.
Sea cargo for the EU needs a complete Entry Summary Declaration under ICS2 Release 3, and for deep-sea containers it is due 24 hours before loading at the departure port. Carriers apply 'no manifest, no load', and a filing without a valid EORI number is rejected, so a data gap in Xiamen leaves the box on the quay.
What Anxin does: We collect the consignee's EORI number, an HS-level goods description and the house-bill parties at booking, and make sure the party filing the ENS has them before the Xiamen cut-off.
Regulation (EU) 2025/1561 pushed the Battery Regulation's due diligence duties for cobalt, lithium, nickel and natural graphite back to 18 August 2027 and gave the Commission until 26 July 2026 for its guidelines. Buyers in Portugal are already collecting the supply-chain information they will need.
What Anxin does: We pass the Portugal buyer's due diligence questions to the manufacturer and keep their answers with the shipment file; the policy itself remains the producer's responsibility.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Xiamen filings, the carrier booking and the Portugal import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Heavy weather off South Africa on a Cape sailing | Cape of Good Hope | CINS stuffing checks | Packing site, checked by Anxin |
| Declaration of conformity missing or not in the required language | Importer in Portugal | Declaration and CE photo collected before loading | Manufacturer / importer |
| ENS not filed and the box is refused at loading | Loading port, Xiamen | EORI and house-bill data passed to the filer at booking | Filer (carrier / forwarder) |
Questions
The importer's: name, registered trade name or trade mark and postal address with a contact point, on the battery or, if it is too small, on the packaging or accompanying document.
Often: in September 2026, 57% of Asia–Mediterranean services used the Red Sea routing. Bab el-Mandeb was rated a SUBSTANTIAL threat by the JMIC on 24 September 2026, so we confirm each service's routing before booking.
For products that pass automatic pre-review, Xiamen Customs issues it through the single window; the case reported in August 2026 took about 10 minutes, against about half a day for the old on-site inspection. Products that do not pass pre-review still need inspection.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Xiamen → Figueira da Foz before any booking, and ask for missing battery documents first.
All destinations from Xiamen · Portugal ports

Share the cargo facts; we review the route in writing.
Request a Quote