Tianjin (Xingang)
North China's main container gateway, where Tianjin Customs lets DG containers be inspected at the factory and loaded on arrival within a booked port slot, and where the Bohai Bay freezes at its edges in mid-winter.
Africa · sea freight from Tianjin
Tianjin to Port Réunion
Bohai Sea · Bohai Strait · Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea
From Tianjin to Port Réunion, cargo moves out of Tianjin's Xingang terminals, crosses the Indian Ocean monsoon corridor, and is discharged at the port of Port Réunion.
In Réunion batteries are an EU import, with a regional tax on top. This page sets out 6 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
North China's main container gateway, where Tianjin Customs lets DG containers be inspected at the factory and loaded on arrival within a booked port slot, and where the Bohai Bay freezes at its edges in mid-winter.
After the Malacca Strait comes the Indian Ocean, where the south-west monsoon and two cyclone seasons decide the pace.


Where this route gets difficult
Loading port first, then the sea leg, then Port Réunion and the Réunion market.
China requires use appraisal of export dangerous-goods packaging before the goods may be exported. Tianjin port's 2025 facilitation measures shortened packaging appraisal time for lithium battery exports through quick release, and Tianjin Port Group provides port services for lithium DG containers, but the appraisal certificate is still a precondition for the rest of the filing.
What Anxin does: We check at quotation that the packaging maker has its performance appraisal and apply for the use appraisal as soon as the packing is fixed, so the certificate is in hand before the MSA filing.
Tianjin MSA itself said in July 2026 that, under the traditional review model, long document reviews often made firms miss the vessel's document cut-off, leaving cargo in port to be re-allocated to another ship. Its new fast-track green channel (appointment-based, more than 50% faster, with a fixed document list) is for new-energy-vehicle cargo; battery shipments should not assume they qualify.
What Anxin does: We submit the cargo report with the full document set (safe-carriage declaration, SDS, packing certificate, packaging certificate) days before the cut-off rather than on the day, and treat any MSA query as same-day work.
Météo-France La Réunion counted 11 named storms, 6 of them tropical cyclones, in the 2025–26 south-west Indian Ocean season (15 November to 30 April), an above-normal year in which Madagascar was hit twice. Sailings to Port Réunion in those months can meet port closures or diversions.
What Anxin does: For November–April sailings we build slack into the delivery plan and track the carrier's revised arrival.
Réunion is an outermost region of the EU and part of its customs territory, so the EU's product and customs rules apply to batteries landed at Port Réunion just as they do in mainland France.
What Anxin does: We treat a shipment to Port Réunion as an EU import: CE documentation, Battery Regulation labelling and the ICS2 filing are checked before loading in Tianjin.
Sea cargo for the EU needs a complete Entry Summary Declaration under ICS2 Release 3, and for deep-sea containers it is due 24 hours before loading at the departure port. Carriers apply 'no manifest, no load', and a filing without a valid EORI number is rejected, so a data gap in Tianjin leaves the box on the quay.
What Anxin does: We collect the consignee's EORI number, an HS-level goods description and the house-bill parties at booking, and make sure the party filing the ENS has them before the Tianjin cut-off.
The Battery Regulation asks the importer to put its own name, registered trade name or trade mark and postal address, with a single contact point, on the battery. Only when the battery's size or nature makes that impossible may the details move to the packaging or an accompanying document, so a Réunion importer's details need to reach the factory before printing.
What Anxin does: We pass the Réunion importer's name and address block to the manufacturer before the goods are packed in China and check carton or battery photos for it before loading.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Tianjin filings, the booking with the carrier and the documents for Réunion before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Port Réunion.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Document review runs past the vessel cut-off; cargo re-allocated to a later ship | Tianjin MSA review | Complete document set filed days before cut-off | Anxin with the declarant |
| Cyclone closes the port or delays arrival | South-west Indian Ocean, Nov–Apr | Slack in delivery plan | Carrier / consignee |
| ENS not filed and the box is refused at loading | Loading port, Tianjin | EORI and house-bill data passed to the filer at booking | Filer (carrier / forwarder) |
| Importer details missing from battery and packaging | Importer in Réunion | Address block sent to the factory before packing | Manufacturer / importer |
Questions
Yes. Activity is suspended and the gantries are anchored; after Cyclone Belal in 2024 operations resumed within three days.
Yes. The south-west Indian Ocean season runs from mid-November to the end of April; Météo-France counted 11 named storms in 2025–26.
The green channel Tianjin MSA announced in July 2026 is for new-energy-vehicle cargo. For battery containers we plan on the normal review and file early, because Tianjin MSA has said long reviews under the traditional model often cost firms their vessel cut-off.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Tianjin → Port Réunion before any booking, and ask for missing battery documents first.
All destinations from Tianjin · Réunion ports

Share the cargo facts; we review the route in writing.
Request a Quote