Lithium battery freight focus Air · Sea · Land assessment Document-first planning

South & Southeast Asia · sea freight from Tianjin

Shipping from Tianjin to Tanjung Emas

Tianjin to Tanjung Emas

Bohai Sea · Bohai Strait · Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Karimata Strait · Java Sea

Sea corridor illustration: Tianjin to Tanjung Emas, Indonesia Simplified map with a curved corridor from Tianjin via Bohai Sea, Bohai Strait, Yellow Sea, East China Sea, Taiwan Strait, South China Sea, Karimata Strait, Java Sea to Tanjung Emas. Illustration only; not a vessel track or schedule. CHINAINDIASOUTHEAST ASIAINDIAN OCEANNORTH PACIFICPACIFIC OCEAN Taiwan StraitSouth China Sea TianjinCHINA ORIGIN Tanjung EmasINDONESIA TianjinBOHAI SEAYELLOW SEASHANDONGDEPARTURE AREA
  1. TianjinChina origin
  2. Bohai Sea
  3. Bohai Strait
  4. Yellow Sea
  5. East China Sea
  6. Taiwan Strait
  7. South China Sea
  8. Karimata Strait
  9. Java Sea
  10. Tanjung EmasIndonesia
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

From Tianjin to Tanjung Emas, cargo moves out of Tianjin's Xingang terminals, crosses Southeast Asian waters, with their typhoon and monsoon seasons, and is discharged at the port of Tanjung Emas.

Indonesia adds a carrier arrival notice 24 hours ahead and an inward manifest before unloading. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.

What we need to start

  • Tianjin Xingang export
  • Factory-supervised loading
  • Used-battery approval
  • 24-hour arrival notice
  • SNI for primary cells

Route profile

The Tianjin → Tanjung Emas route in brief

Origin port

Tianjin (Xingang)

North China's main container gateway, where Tianjin Customs lets DG containers be inspected at the factory and loaded on arrival within a booked port slot, and where the Bohai Bay freezes at its edges in mid-winter.

Import country

Indonesia

Indonesia's carrier filings come before unloading; the importer handles SNI and any used-goods approval.

Container gantry cranes at a Tianjin port container terminal
A container ship under way off the Guatemalan coast

Where this route gets difficult

What to watch between Tianjin and Tanjung Emas: 5 points

Loading port first, then the sea leg, then Tanjung Emas and the Indonesia market.

  1. Origin port

    Tianjin's supervised factory loading and port slots

    Under Tianjin Customs' 'supervised factory loading, direct loading on port arrival' model, officers supervise stuffing at the factory, the declaration is lodged early through the single window, and the box enters the port in a slot booked on the customs–port platform before going straight to the ship; inspections take place in closed yards at the Beijiang and Dongjiang terminals. The gain holds only if stuffing date, slot and declared data agree.

    What Anxin does: We fix the stuffing date against the vessel's DG cut-off first, then book the entry slot, and check that the declaration, the packing certificate and the container number agree before the truck leaves, so the box is not diverted to an inspection yard for a data mismatch.

  2. Origin port

    Document review time at Tianjin and the cut-off

    In July 2026 Tianjin MSA acknowledged that long document reviews under its traditional model often caused firms to miss the vessel's document cut-off, leaving cargo in port for another ship. The new appointment-based green channel, more than 50% faster with a fixed document list, is for new-energy-vehicle cargo; battery shipments should not count on it.

    What Anxin does: We submit the cargo report with the full document set (safe-carriage declaration, SDS, packing certificate, packaging certificate) days before the cut-off rather than on the day, and treat any MSA query as same-day work.

  3. Sea corridor

    A Singapore relay needs its own DG declaration

    If the container for Tanjung Emas relays in Singapore, the Port Master must receive a dangerous goods declaration at least 12 hours before the vessel arrives, for DG in transit as well as for DG discharged or loaded. At PSA terminals it goes through PORTNET, and storage of DG at the terminal needs the operator's approval.

    What Anxin does: We give the carrier the UN number, class, packing group and packages at booking, so the Singapore declaration for the relay can be filed on time by the carrier's agent.

  4. Import country

    RKSP and inward manifest: the carrier files before Tanjung Emas

    Under PMK 158 the carrier notifies arrival 24 hours ahead and files the inward manifest before unloading. For a battery container from Tianjin, the manifest's description has to match the DG papers exactly.

    What Anxin does: We give the carrier final cargo data, HS code and UN number before sailing from Tianjin, so the Indonesian manifest matches the DG declaration.

  5. Import country

    SNI is mandatory for primary batteries since May 2025

    Permenperin 69/2024 made the SNI standard mandatory for primary batteries from 20 May 2025. Primary cells shipped to Tanjung Emas without SNI certification and marking cannot be imported or sold, which matters for mixed shipments of devices and spare cells.

    What Anxin does: When a shipment includes primary cells, we ask the importer for the SNI certificate and check the marking on carton photos before loading.

Locator map of Tanjung Emas, IndonesiaTanjung Emas
Locator map in the same projection as the corridor map; the dot marks the listed port position (6.95°S, 110.42°E).
Straddle carriers and container handling equipment at a port

Documents & compliance

Documents to line up for Tianjin → Tanjung Emas

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

At the Tianjin end

  • Stuffing date, port-entry slot and DG cut-off at Tianjin agreed in that order
  • Transport-condition classification report where applicable
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)
  • Blocking and bracing photos for monsoon-season sailings
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report

For the shipping line

  • DG acceptance confirmed for a back-up vessel in typhoon months
  • Condition statement: new, used, damaged/defective (SP376) or for recycling (SP377)
  • Cargo data matching the DG declaration for the inward manifest

For import into Indonesia

  • SNI certificate for any primary cells in the shipment
  • Import approval and surveyor report for used batteries
Cartons on a pallet being stretch-wrapped
Before you book

Match the details first

We line up UN numbers, model names and package counts across the Tianjin filings, the booking with the carrier and the documents for Indonesia before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Tanjung Emas.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risk table for Tianjin → Tanjung Emas

RiskWhereMitigationWho acts
Document review runs past the vessel cut-off; cargo re-allocated to a later shipTianjin MSA reviewComplete document set filed days before cut-offAnxin with the declarant
Box sent to the terminal inspection yard because declared data do not matchBeijiang / Dongjiang terminalsDeclaration, packing certificate and container number cross-checked before truckingAnxin
Container held for a manifest mismatchIndonesian port of dischargeManifest data checked against the DG declarationCarrier, with data from Anxin

Questions

Common questions on the Tianjin → Tanjung Emas route

The arrival notice goes in at least 24 hours before arrival for voyages of 24 hours or more, and the inward manifest before unloading.

It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.

The green channel Tianjin MSA announced in July 2026 is for new-energy-vehicle cargo. For battery containers we plan on the normal review and file early, because Tianjin MSA has said long reviews under the traditional model often cost firms their vessel cut-off.

References

Regulations and port sources cited

  1. Permendag No. 24 Tahun 2025: import of goods in non-new condition and non-hazardous waste (Kementerian Hukum (peraturan.go.id))
  2. PMK 158/PMK.04/2017 on arrival notification, inward manifest and outward manifest (Kementerian Keuangan (JDIH))
  3. Weather phenomena: Northeast Monsoon (Malaysian Meteorological Department (MetMalaysia))
  4. Tianjin Customs export dangerous goods service page: supervised factory loading, direct loading on port arrival (Tianjin Customs)
  5. Tianjin MSA opens a green channel for new-energy-vehicle shipments (Tianjin Economic-Technological Development Area (TEDA) Administration)

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Tianjin
  5. 5ImportClearance at Tanjung Emas
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Tianjin → Tanjung Emas

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Tianjin → Tanjung Emas before any booking, and ask for missing battery documents first.

All destinations from Tianjin · Indonesia ports

A truck hauling a teal shipping container on a motorway

Need Tianjin → Tanjung Emas reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp