Lithium battery freight focus Air · Sea · Land assessment Document-first planning

Africa · sea freight from Tianjin

Shipping from Tianjin to Tema

Tianjin to Tema

Bohai Sea · Bohai Strait · Taiwan Strait · Malacca Strait · Andaman Sea · Indian Ocean · Cape of Good Hope · Gulf of Guinea

Sea corridor illustration: Tianjin to Tema, Ghana Simplified map with a curved corridor from Tianjin via Bohai Sea, Bohai Strait, Taiwan Strait, Malacca Strait, Andaman Sea, Indian Ocean, Cape of Good Hope, Gulf of Guinea to Tema. Illustration only; not a vessel track or schedule. CHINAINDIAARABIAN PENINSULAAUSTRALIAAFRICAINDIAN OCEANNORTH ATLANTICNORTH PACIFICPACIFIC OCEAN Taiwan StraitSingapore / MalaccaCape of Good Hope TianjinCHINA ORIGIN TemaGHANA TianjinBOHAI SEAYELLOW SEASHANDONGDEPARTURE AREA
  1. TianjinChina origin
  2. Bohai Sea
  3. Bohai Strait
  4. Taiwan Strait
  5. Malacca Strait
  6. Andaman Sea
  7. Indian Ocean
  8. Cape of Good Hope
  9. Gulf of Guinea
  10. TemaGhana
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

From Tianjin to Tema, cargo moves out of Tianjin's Xingang terminals, crosses a corridor round the Cape of Good Hope to Africa's Atlantic side, and is discharged at the port of Tema.

On the Ghanaian side the IDF and the ICUMS declaration come first. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.

What we need to start

  • Bohai Bay winter ice
  • Tianjin Xingang export
  • Import Declaration Form
  • ICUMS
  • MPS Terminal 3

Route profile

How Tianjin → Tema differs from other lanes

Sea corridor

Asia – Africa's Atlantic coast via the Cape of Good Hope

A Cape of Good Hope corridor that the Red Sea crisis does not touch, but that crosses the waters where about a third of 2024's lost containers went overboard.

Import country

Ghana

An Import Declaration Form before import, a broker-filed ICUMS declaration, and Tema's deep-water MPS terminal.

Container gantry cranes at a Tianjin port container terminal
A cargo ship at anchor in calm water under a clear sky

Where this route gets difficult

Where Tianjin → Tema shipments get held up: 5 points

Listed from loading in Tianjin to import into Ghana, each with what we do about it.

  1. Origin port

    Ice at the Haihe estuary in winter

    Every winter the Bohai Sea ices over, and the Haihe estuary at Tianjin is one of the harder-hit areas. For 2021/22 the national marine forecast centre put the peak ice period between mid-January and mid-February, with floating ice about 5 nautical miles out in Bohai Bay. Ice and cold slow port work just as the Chinese New Year peak arrives.

    What Anxin does: For January and February sailings from Tianjin we add slack between stuffing and the DG cut-off and confirm the vessel's berthing window with the carrier the week before loading.

  2. Origin port

    Packaging appraisal is still the first step at Tianjin

    Export dangerous-goods packaging must pass use appraisal in China before the goods can leave. Tianjin port's 2025 measures shortened appraisal time for lithium battery exports through quick release, and Tianjin Port Group handles lithium DG containers, but without the appraisal certificate the rest of the filing cannot proceed.

    What Anxin does: We check at quotation that the packaging maker has its performance appraisal and apply for the use appraisal as soon as the packing is fixed, so the certificate is in hand before the MSA filing.

  3. China export

    Two maritime filings and a signed packing certificate before loading

    Every lithium battery container leaving Tianjin needs a cargo safe-carriage report and a ship's dangerous goods permit filed with the Maritime Safety Administration by a certified declarant, and a container packing certificate signed by a certified inspector who watched the stuffing. Separately, customs must have appraised the packaging in use; export of dangerous goods in unappraised packaging is not allowed.

    What Anxin does: We work only with packing sites and declarants holding the required certificates, and we collect the packaging use-appraisal result before the container is stuffed.

  4. Sea corridor

    No Red Sea exposure, but the Cape is not a calm alternative

    The drawn corridor to Tema goes round the Cape of Good Hope, so the Red Sea situation does not decide this routing. The Cape leg carries its own risk: the South African Maritime Safety Authority estimates about 200 of the 576 containers lost worldwide in 2024 went overboard near the Cape, roughly 35% of the year's total.

    What Anxin does: We plan packing for a long, rough passage: stuffing photos at every stage, blocking checked against the CINS points, and any transhipment port named on the booking.

  5. Import country

    Ghana's IDF and ICUMS declaration

    Imports into Ghana start with an Import Declaration Form; the broker then files the declaration in ICUMS with the B/L, invoice, packing list and IDF. Batteries for Tema are assessed on those documents, so they must agree with each other.

    What Anxin does: We check that the invoice and packing list from Tianjin match the goods on the consignee's IDF before the bill of lading is issued.

Locator map of Tema, GhanaTema
Locator map in the same projection as the corridor map; the dot marks the listed port position (5.63°N, 0.02°E).
Rows of containers with a forklift at the Port of Mombasa

Documents & compliance

Checklist for Tianjin → Tema

These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

Before loading in Tianjin

  • Packaging use-appraisal certificate issued before the MSA cargo report is filed
  • Transport-condition classification report where applicable
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)

For the shipping line

  • Transhipment port (if any) named on the booking, and the carrier's acceptance of the UN numbers on every leg
  • Dangerous goods declaration with UN number (3480 / 3481 / 3090 / 3091), proper shipping name and packing instruction (P903, or P908/P911 for damaged)
  • Lithium battery mark (SP188 cargo) or class 9 labels and placards

For import into Ghana

  • Import Declaration Form obtained by the importer before shipment
Cartons on a pallet being stretch-wrapped
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Tianjin export filings, the carrier booking and the Ghana import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risks on this route and who deals with them

RiskWhereMitigationWho acts
Ice or cold spell slows berthing in mid-winterBohai Bay, Jan–FebSlack between stuffing and cut-off; berthing window reconfirmedCarrier, monitored by Anxin
Heavy weather off South AfricaCape of Good HopeBlocking and bracing checked on stuffing photos before sealingPacking site, checked by Anxin
Declaration delayed by documents that do not match the IDFGhana customsDocuments checked against the IDFAnxin with the consignee

Questions

Common questions on the Tianjin → Tema route

An Import Declaration Form. A licensed broker then lodges the declaration in ICUMS.

The IMB counted 21 incidents and 23 crew kidnapped in the Gulf of Guinea in 2025. We aim to have the documents ready for prompt discharge.

The green channel Tianjin MSA announced in July 2026 is for new-energy-vehicle cargo. For battery containers we plan on the normal review and file early, because Tianjin MSA has said long reviews under the traditional model often cost firms their vessel cut-off.

References

Regulations and port sources cited

  1. ICUMS (Ghana Revenue Authority, Customs Division)
  2. Import procedures (Ghana Revenue Authority, Customs Division)
  3. Tianjin MSA opens a green channel for new-energy-vehicle shipments (Tianjin Economic-Technological Development Area (TEDA) Administration)
  4. Tianjin port 2025 cross-border trade facilitation measures (Tianjin Municipal Government (tjjz.gov.cn))
  5. Sea ice arrives: what are the impacts? (Bohai and northern Yellow Sea, winter 2021/22) (China Meteorological Administration (from China Natural Resources News))
  6. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Tianjin
  5. 5ImportClearance at Tema
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Tianjin → Tema

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Tianjin → Tema before any booking, and ask for missing battery documents first.

All destinations from Tianjin · Ghana ports

Trailers backed up to the loading docks of a warehouse

Need Tianjin → Tema reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp