Lithium battery freight focus Air · Sea · Land assessment Document-first planning

Northeast Asia · sea freight from Shenzhen

Shipping from Shenzhen to Pyeongtaek

Shenzhen to Pyeongtaek

South China Sea · Taiwan Strait · East China Sea · Yellow Sea

Sea corridor illustration: Shenzhen to Pyeongtaek, South Korea Simplified map with a curved corridor from Shenzhen via South China Sea, Taiwan Strait, East China Sea, Yellow Sea to Pyeongtaek. Illustration only; not a vessel track or schedule. CHINAJAPAN Taiwan StraitEast China Sea ShenzhenCHINA ORIGIN PyeongtaekSOUTH KOREA ShenzhenSOUTH CHINA SEAGUANGDONGDEPARTURE AREA
  1. ShenzhenChina origin
  2. South China Sea
  3. Taiwan Strait
  4. East China Sea
  5. Yellow Sea
  6. PyeongtaekSouth Korea
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

Lithium batteries for Pyeongtaek go out of Shenzhen's Yantian and Shekou terminals. On the way they face a short-sea route within Asia, and they arrive at the port of Pyeongtaek.

In Korea the manifest is filed before the ship leaves China and DG are reported to the port authority. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.

What we need to start

  • Typhoon season Jun–Oct
  • Yantian / Shekou export
  • KAMS manifest
  • DG report
  • KC safety

Route profile

How Shenzhen → Pyeongtaek differs from other lanes

Origin port

Shenzhen (Yantian / Shekou)

Pearl River Delta battery cargo, often stuffed at factories in Dongguan or Huizhou, exported through Yantian or Shekou, with a typhoon season from June to October.

Sea corridor

Intra-Asia

A short-sea Asian route with no canal or chokepoint, where typhoons in summer and the north-east monsoon in winter set the pace.

Yantian port area in Shenzhen seen from the hills, with container berths along the bay
A container ship under way off the Guatemalan coast

Where this route gets difficult

5 points to plan for on the Shenzhen → Pyeongtaek route

In the order the cargo meets them: at the loading port, at sea, at Pyeongtaek and at customs in South Korea.

  1. Origin port

    Typhoon season squeezes Shenzhen cut-offs

    The Hong Kong Observatory puts the regional tropical cyclone season from June to October, busiest July to September. DG containers need their MSA filings approved and a signed packing certificate before loading, so a closed gate or a rolled vessel in typhoon weeks can push the whole document chain to a new sailing.

    What Anxin does: From June to October we build slack into the stuffing date, confirm the DG cut-off with the carrier the week before loading, and resubmit filings promptly if the vessel changes.

  2. Origin port

    Factory stuffing in Dongguan, loading at Yantian: avoid a second opening

    Much Shenzhen battery export is stuffed inland and trucked to the terminal. In May 2026 Yantian MSA and Dongguan MSA ran a cross-regional 'one-box' pilot: four battery containers were inspected jointly at the Dongguan factory and loaded at Yantian without being opened again. It shows that the inspection record made at the factory is what matters at the terminal.

    What Anxin does: We ask at booking whether your factory and the terminal's MSA office can use the one-box arrangement, and we have stuffing photos, the packing certificate and the DG declaration match exactly, so the container is not held for re-inspection.

  3. Sea corridor

    Yellow Sea fog, April to July

    The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. Short Yellow Sea crossings are the ones most exposed: a fog hold at either end can move the box to a later vessel, and the DG filings with it.

    What Anxin does: In fog season we leave slack between stuffing and the DG cut-off and keep the filing data ready to amend.

  4. Import country

    A new law for end-of-life EV and ESS batteries

    Korea's National Assembly passed the End-of-Life Battery Act on 23 April 2026. It covers traction batteries from electric vehicles and batteries in energy storage systems, and takes effect a year after promulgation. Importers of ESS or traction batteries through Pyeongtaek should expect new duties at end of life.

    What Anxin does: For ESS and traction batteries we flag the new Act to the Korean importer, so its end-of-life plan is in place before the rules take effect.

  5. Import country

    The shipper's DG data feeds the port report

    At Pyeongtaek, dangerous goods are reported to the Ministry of Oceans and Fisheries before they come in, 24 hours ahead as a rule. The Act puts shippers and forwarders under a duty to notify the DG details, so gaps in the data from Shenzhen show up here.

    What Anxin does: We give the carrier's agent the UN number, class, packing group and quantity at booking, which is what the DG report for Pyeongtaek needs.

Locator map of Pyeongtaek, South KoreaPyeongtaek
Locator map in the same projection as the corridor map; the dot marks the listed port position (36.97°N, 127.10°E).
Stacked containers at a Busan port container yard at dusk

Documents & compliance

Checklist for Shenzhen → Pyeongtaek

Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

At the Shenzhen end

  • Confirmation from the carrier of the DG cut-off at Yantian or Shekou, rechecked in typhoon weeks
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing

Carrier and voyage

  • Final DG data for the KAMS manifest before departure
  • UN number, class and quantity for the MOF dangerous goods report
  • UN 38.3 test summary for every cell and battery type

At the South Korea end

  • KC safety confirmation for each battery model
A cordless drill with its battery pack attached
Before you book

Match the details first

We line up UN numbers, model names and package counts across the Shenzhen filings, the booking with the carrier and the documents for South Korea before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Pyeongtaek.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risk table for Shenzhen → Pyeongtaek

RiskWhereMitigationWho acts
Typhoon closes terminals or delays the vessel after filings are madeYantian / Shekou, Jun–OctSlack in stuffing date; refile quickly on vessel changeAnxin with the declarant
Container reopened at the terminal because records do not matchFactory → YantianPhotos, packing certificate and DG declaration cross-checked before truckingAnxin
DG report late or incomplete; discharge heldKorean port of dischargeDG data given at bookingCarrier's agent, with data from Anxin

Questions

Common questions on the Shenzhen → Pyeongtaek route

A requirement confirmation in UNI-PASS based on the KC certificate or confirmation, before the import declaration.

Typhoons occur all year in the western North Pacific, but most in August and September: the Japan Meteorological Agency's 1991–2020 averages are 5.7 and 5.0 typhoons in those months.

Yes, provided a certified packing inspector supervises the stuffing and signs the container packing certificate. Since May 2026 Yantian and Dongguan MSA have also piloted joint factory inspection so the container can be loaded at Yantian without reopening; we check whether your shipment can use it.

References

Regulations and port sources cited

  1. Act on the Arrival and Departure of Ships (English translation) (Korea Legislation Research Institute)
  2. The Korea Advance Manifest System (KAMS) guidelines (Korea Customs Service (via JMCTI))
  3. Report on bringing in dangerous goods (위험물반입신고) (Gunsan Regional Office of Oceans and Fisheries, Ministry of Oceans and Fisheries)
  4. Typhoon statistics: average number of typhoons (1991–2020) (Japan Meteorological Agency)
  5. Sea fog in the Yellow and Bohai Seas (fog season mainly April–July) (China Meteorological Administration (from Guangming Daily))
  6. Yantian MSA runs 'one-box' model for lithium battery sea exports (Chinese), 8 May 2026 (Shenzhen Development and Reform Commission (source: Shenzhen MSA))
  7. Forecasting yearly number of tropical cyclones affecting Hong Kong (tropical cyclone season June–October, most active July–September) (Hong Kong Observatory)
  8. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Shenzhen
  5. 5ImportClearance at Pyeongtaek
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Shenzhen → Pyeongtaek

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Shenzhen → Pyeongtaek before any booking, and ask for missing battery documents first.

All destinations from Shenzhen · South Korea ports

A forklift moving palletised cartons in a warehouse

Need Shenzhen → Pyeongtaek reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp