Asia – Americas via the Panama Canal
Gatun Lake levels set how much a ship can load through Panama; the Caribbean leg then crosses hurricane waters from June to November.
North America · sea freight from Shanghai
Shanghai to Searsport
East China Sea · Korea Strait · Tsugaru Strait · Eastern Pacific · Panama Canal · Caribbean Sea · Windward Passage · US East Coast
This route runs out of Shanghai, where MSA spot-checks battery containers during and after filing, then follows a corridor through the Panama Canal; at the far end is the port of Searsport.
The US side adds a 25% Section 301 duty line, forced-labour scrutiny of lithium supply chains and an ISF deadline that falls before loading. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
Gatun Lake levels set how much a ship can load through Panama; the Caribbean leg then crosses hurricane waters from June to November.
From ISF and AMS in China to a monitored emergency number on the US truck leg, with Section 301 and UFLPA shaping what arrives.


Where this route gets difficult
Listed from loading in Shanghai to import into United States, each with what we do about it.
At Shanghai the packing inspector must upload photos taken before, during and after stuffing through the MSA's remote system, with face recognition and phone location on, before the electronic packing certificate goes out by EDI. A container is not loaded if the photos are missing, uploaded late, taken outside the verified stuffing site, or do not match the EDI cargo data. Stuffing sites outside Shanghai must be registered with Shanghai MSA.
What Anxin does: We confirm that the stuffing site (including factory sites in Jiangsu or Zhejiang) is registered for Shanghai's remote system, and we check the photo upload against the EDI data before the packing certificate is sent.
How deep ships can load through Panama's new locks depends on Gatun Lake. In September 2026 the Canal Authority's advisory A-33-2026 postponed a cut in the Neopanamax draft from 14.63 m to 14.48 m that had been due on 1 October, citing lake levels; a lower limit reduces what a ship bound for Searsport can carry.
What Anxin does: We check the canal advisory in force when we quote for Searsport and ask carriers to confirm that the booked vessel's routing and any canal surcharge will not change before sailing.
DHS added lithium to the Uyghur Forced Labor Prevention Act high-priority sectors in August 2025. By then CBP had stopped more than 16,700 shipments for UFLPA examination. For battery importers the practical effect is that CBP can ask where cells, cathode and lithium compounds came from, and a shipment waits while the importer answers.
What Anxin does: We tell the importer at quotation stage that supply-chain tracing may be requested, and keep manufacturer names and addresses consistent across invoice, packing list and ISF so the paper trail does not contradict itself.
Consumer products that need a CPSC certificate have had their certificate data filed electronically at entry since 8 July 2026 (goods from a Foreign Trade Zone from 8 January 2027). A battery-powered product falls under it through the product's own rules, which the importer should settle before the goods reach Searsport.
What Anxin does: We ask whether the goods are consumer products that need a CPSC certificate and, if so, who files it, so that the question is settled before the goods arrive.
If a battery container waits at Searsport, the demurrage or detention invoice has to arrive within 30 days and carry accurate and sufficient information, or the charge is not owed (46 CFR part 541). The billed party then has at least 30 days to dispute it; in 2025 the D.C. Circuit struck down only the rule on who may be invoiced.
What Anxin does: We keep the dates of discharge, availability and any DG hold for each container, so the importer can check invoices against them and dispute charges inside the FMC time limits.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Shanghai filings, the carrier booking and the United States import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Container refused for loading: photos late, off-site or not matching EDI data | Yangshan / Waigaoqiao | Photo upload checked against EDI data before the certificate is sent | Packing inspector, checked by Anxin |
| Draft cut reduces capacity or adds surcharges | Panama Canal | Advisory checked at quotation; carrier confirmation | Carrier, checked by Anxin |
| UFLPA detention pending supply-chain evidence | CBP at entry | Importer prepares tracing documents before shipping; consistent manufacturer data on all documents | Importer |
Questions
No. The carrier must also send its cargo declaration through AMS 24 hours before loading, and CBP will not issue the permit to unlade without it.
It can. In September 2026 the Panama Canal Authority postponed a planned draft cut in the Neopanamax locks because of Gatun Lake levels (advisory A-33-2026). We check the advisory in force when quoting.
It can, but Shanghai MSA checks the phone location of the packing photos against a verified stuffing site, and sites outside Shanghai must be registered with it. We confirm registration before the stuffing date; otherwise the container can be refused for loading.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Shanghai → Searsport before any booking, and ask for missing battery documents first.
All destinations from Shanghai · United States ports

Share the cargo facts; we review the route in writing.
Request a Quote