Lithium battery freight focus Air · Sea · Land assessment Document-first planning

South & Southeast Asia · sea freight from Shanghai

Shipping from Shanghai to Jawaharlal Nehru Port

Shanghai to Jawaharlal Nehru Port

East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Indian Ocean

Sea corridor illustration: Shanghai to Jawaharlal Nehru Port, India Simplified map with a curved corridor from Shanghai via East China Sea, Taiwan Strait, South China Sea, Malacca Strait, Andaman Sea, Indian Ocean to Jawaharlal Nehru Port. Illustration only; not a vessel track or schedule. CHINAINDIASOUTH CHINA SEA Taiwan StraitSingapore / MalaccaSouth of Sri Lanka ShanghaiCHINA ORIGIN Jawaharlal Nehru PortINDIA ShanghaiEAST CHINA SEAJIANGSUZHEJIANGDEPARTURE AREA
  1. ShanghaiChina origin
  2. East China Sea
  3. Taiwan Strait
  4. South China Sea
  5. Malacca Strait
  6. Andaman Sea
  7. Indian Ocean
  8. Jawaharlal Nehru PortIndia
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

This route runs out of Shanghai, where MSA spot-checks battery containers during and after filing, then follows the Indian Ocean monsoon corridor; at the far end is the port of Jawaharlal Nehru Port.

On the Indian side the importer is an EPR producer and the Bill of Entry is due the day before arrival. The 6 points below are particular to this lane; each comes with what we do and the paperwork it touches.

What we need to start

  • Photo-verified packing certificate
  • Yangshan / Waigaoqiao export
  • CPCB EPR
  • Advance Bill of Entry
  • BIS CRS

Route profile

How Shanghai → Jawaharlal Nehru Port differs from other lanes

Sea corridor

Asia – Indian Ocean

An Indian Ocean route: rough south-west monsoon seas from June to September and cyclone windows in April-May and October-December.

Import country

India

BIS registration verified model by model, EPR registration for importers, and a Bill of Entry due before the ship arrives.

Yangshan deep-water port near Shanghai seen from a hillside, with container stacks and gantry cranes
A container ship under way off the Guatemalan coast

Where this route gets difficult

What to watch between Shanghai and Jawaharlal Nehru Port: 6 points

Listed from loading in Shanghai to import into India, each with what we do about it.

  1. Origin port

    Not every Shanghai warehouse can stuff lithium DG

    Shanghai MSA's 2024 draft reporting guide says warehouses that stuff lithium battery dangerous goods must provide fire-department proof of their fire hazard classification and fire-resistance rating. The site's information must also be up to date on the Shanghai single window, which took over MSA account and site records in 2026.

    What Anxin does: We only propose stuffing sites that can show the fire-safety documents and are on Shanghai MSA's system; if you use your own warehouse, we check this before booking.

  2. Origin port

    Shanghai checks during and after the voyage filing, not just before

    Shanghai MSA's Notice No. 4 of 2024 accepts either an inspector-signed packing certificate or a packing declaration from the stuffing company, but places the burden on the shipper: the batteries must meet the UN tests and be protected against damage, short circuit and accidental activation, and MSA runs spot checks during and after the process, with proof to be produced on request.

    What Anxin does: We keep a file per container (UN38.3 summary, SDS, packing photos, terminal protection details) so that proof can be produced the same day if Shanghai MSA asks for it after sailing.

  3. Sea corridor

    June to September: south-west monsoon seas

    From June to September the south-west monsoon brings rough seas to the Arabian Sea and the Bay of Bengal. A container heading for Jawaharlal Nehru Port in those months meets heavy rolling, which loosens a poorly braced load.

    What Anxin does: In monsoon months we check blocking and bracing strictly on stuffing photos before sealing.

  4. Import country

    Monsoon rain at Jawaharlal Nehru Port from June

    IMD puts the normal monsoon onset over Kerala at 1 June; in 2026 it came on 4 June and then spread north, reaching the whole country around mid-July. Battery cartons arriving at Jawaharlal Nehru Port in this period need to stay dry through discharge and delivery.

    What Anxin does: For monsoon-season arrivals at Jawaharlal Nehru Port we ask for cartons with moisture protection and tell the consignee to plan unstuffing under cover.

  5. Import country

    Jawaharlal Nehru Port (JNPA): 92 % overseas cargo in 2025-26

    India's Ministry of Ports reports 102.01 million tonnes at Jawaharlal Nehru Port (JNPA) in 2025-26 (+10.74 %), 93.43 million tonnes of it overseas. For Jawaharlal Nehru Port, the box from Shanghai enters a mainly international flow, so the Bill of Entry data should reach the consignee's broker before arrival.

    What Anxin does: We confirm the discharge terminal for the box from Shanghai with the carrier and pass it to the consignee's broker at Jawaharlal Nehru Port.

  6. Import country

    crsbis.in decides: manufacturer, model and factory must match

    Indian customs now verify BIS registrations online (CBIC Instruction 27/2025). If the manufacturer, model or factory location on the documents for Jawaharlal Nehru Port differs from crsbis.in, or the registration is deferred or cancelled, the goods are not cleared.

    What Anxin does: We compare the model numbers and factory address on the invoice with the registration shown on crsbis.in before the goods leave Shanghai.

Locator map of Jawaharlal Nehru Port, IndiaJawaharlal Nehru Port
Locator map in the same projection as the corridor map; the dot marks the listed port position (18.95°N, 72.95°E).
Container ship and stacked containers at the Port of Colombo

Documents & compliance

What to have ready: Shanghai to Jawaharlal Nehru Port

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

At the Shanghai end

  • Stuffing site registered and geo-verified with Shanghai MSA; fire-safety proof for lithium DG warehouses
  • Per-container evidence file (UN38.3 summary, SDS, photos, short-circuit protection) kept for Shanghai MSA spot checks
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable

For the shipping line

  • Carrier's revised arrival reconfirmed in the cyclone season before booking onward transport
  • Condition statement: new, used, damaged/defective (SP376) or for recycling (SP377)
  • Relay port and feeder DG acceptance confirmed for Indian destinations

For import into India

  • Importer's CPCB producer registration
  • Documents with the broker in time for the advance Bill of Entry
Cartons on a pallet being stretch-wrapped
Before you book

Match the details first

We line up UN numbers, model names and package counts across the Shanghai filings, the booking with the carrier and the documents for India before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Jawaharlal Nehru Port.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

What could go wrong from Shanghai to Jawaharlal Nehru Port, and who acts

RiskWhereMitigationWho acts
Post-event spot check finds missing proofShanghai MSAEvidence file kept per containerShipper with Anxin
Clearance refused for a registration mismatchIndian port of dischargeRegistration checked before shipmentManufacturer and importer

Questions

Questions about shipping from Shanghai to Jawaharlal Nehru Port

Yes. They fall under BIS's Compulsory Registration Scheme (IS 16046 Part 2), and the R-number is declared in the Bill of Entry.

The India Meteorological Department describes two North Indian Ocean seasons, April–May and October–December, the latter being the main one.

Shanghai MSA's Notice No. 4 of 2024 accepts either an inspector-signed packing certificate or a packing declaration issued by the stuffing company. Either way, the shipper remains responsible and must provide proof if MSA spot-checks.

References

Official sources for this page

  1. BIS Compulsory Registration Scheme: sealed secondary lithium-ion cells and batteries, IS 16046 (Part 2) (Bureau of Indian Standards CRS portal)
  2. Circular 08/2021-Customs: clarifications on legislative changes in section 46 (CBIC (TaxGuru copy))
  3. CBIC Instruction 27/2025-Customs: validation of BIS registration at time of clearance (CBIC (copy via CAalley))
  4. Frequently asked questions under Battery Waste Management Rules, 2022 (Central Pollution Control Board)
  5. Customs Act 1962, section 46 (entry of goods on importation) (India Code)
  6. Onset and advance of monsoon (India Meteorological Department)
  7. Southwest Monsoon has set in over Kerala, today the 4 June, 2026 (India Meteorological Department)
  8. Cargo Handling Status for Major Ports during March 2026 (Table 1: Major Port-wise Monthly Cargo handled) (Ministry of Ports, Shipping and Waterways, Government of India)
  9. Frequently asked questions on tropical cyclones (India Meteorological Department, RSMC New Delhi)
  10. The Indian Monsoon (southwest monsoon June–September) (Press Information Bureau, Government of India)
  11. Port of Colombo records historic high of 8.29 million TEUs in 2025 (Sri Lanka Ports Authority)
  12. Notice on the trial of the remote smart management system for DG container packing (Chinese), 12 November 2021 (Shanghai Maritime Safety Administration)
  13. Shanghai MSA Notice No. 4 of 2024 on declaring lithium battery dangerous-goods containers (Shanghai Maritime Safety Administration)
  14. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Shanghai
  5. 5ImportClearance at Jawaharlal Nehru Port
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Shanghai → Jawaharlal Nehru Port

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Shanghai → Jawaharlal Nehru Port before any booking, and ask for missing battery documents first.

All destinations from Shanghai · India ports

Trailers backed up to the loading docks of a warehouse

Need Shanghai → Jawaharlal Nehru Port reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp