Asia – Southeast Asian seas
No canal on this route, but two seasons to plan around: typhoons in summer and autumn and the north-east monsoon from November to March.
South & Southeast Asia · sea freight from Lianyungang
Lianyungang to Hai Phong
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Gulf of Tonkin
This route runs from northern Jiangsu through Lianyungang on the Yellow Sea, then follows Southeast Asian waters, with their typhoon and monsoon seasons; at the far end is the port of Hai Phong.
On the Vietnamese side the manifest deadline is short and importers carry an EPR obligation for batteries. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
No canal on this route, but two seasons to plan around: typhoons in summer and autumn and the north-east monsoon from November to March.
Vietnam's filings come early, its EPR rules reach importers, and storms close ports on this coast.


Where this route gets difficult
Listed from loading in Lianyungang to import into Vietnam, each with what we do about it.
Lianyungang MSA's June 2025 guide for ESS on break-bulk ships treats ESS cabinets as UN3480 and ESS containers as UN3536, recommends a remaining charge of 20–50%, and requires converters and monitoring to be powered off, series and parallel circuits disconnected, packages evenly spread with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. At Lianyungang, as at Qingdao, fog can hold vessels at anchor, and a changed vessel means amended DG filings.
What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.
Routes from northern China to Hai Phong go through the Taiwan Strait, whose funnel effect makes winds 1-2 Beaufort levels stronger than outside. In winter and spring the north-east monsoon brings force 7 or more on about two-thirds of days, which is hard on a load that has not been braced.
What Anxin does: We ask for blocking and bracing photos before the container is closed in Lianyungang, checked against the CINS stuffing guidance for lithium batteries.
Decree 05/2025 keeps batteries under Vietnam's extended producer responsibility rules. Importers, like producers, must either recycle the batteries they place on the market or pay into the Vietnam Environment Protection Fund.
What Anxin does: At quotation we remind the importer at Hai Phong that the EPR obligation follows the goods, so it can register the volumes it imports.
When Typhoon Yagi struck in September 2024, Hai Phong and Quang Ninh closed their ports from 6 September, and quay cranes collapsed at the MIPEC and Nam Dinh Vu terminals. A storm on this coast can stop work at Hai Phong for days and damage stacked containers.
What Anxin does: In the storm season we ask the consignee at Hai Phong to collect battery containers promptly after discharge rather than leave them stacked in the terminal.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Lianyungang filings, the carrier booking and the Vietnam import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| Port closure and yard damage in a typhoon | Northern Vietnam, Jul-Oct | Prompt collection after discharge | Consignee |
Questions
Twelve hours before arrival for voyages under five days, 24 hours for longer ones, together with the e-manifest and B/L data.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Hai Phong before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Vietnam ports

Share the cargo facts; we review the route in writing.
Request a Quote