Asia – Americas via the Panama Canal
A Pacific crossing, a Panama Canal transit that depends on lake levels, and a Caribbean passage in hurricane season.
North America · sea freight from Lianyungang
Lianyungang to Jacksonville
Yellow Sea · Korea Strait · Tsugaru Strait · North Pacific · Eastern Pacific · Panama Canal · Caribbean Sea · Windward Passage
This route runs out of Lianyungang, where the MSA simplified 'new three' filings in 2024, then follows the Pacific, the Panama Canal and the Caribbean; at the far end is the port of Jacksonville.
The US side adds a 25% Section 301 duty line, forced-labour scrutiny of lithium supply chains and an ISF deadline that falls before loading. Below are 6 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
A Pacific crossing, a Panama Canal transit that depends on lake levels, and a Caribbean passage in hurricane season.
Section 301 duty on Chinese lithium-ion batteries at 25% since January 2026, UFLPA scrutiny of lithium supply chains, ISF 24 hours before loading, and a US-only marking rule for SP188 packages.


Where this route gets difficult
Listed from loading in Lianyungang to import into United States, each with what we do about it.
Between April and July sea fog is a major marine hazard in the Yellow and Bohai Seas, the China Meteorological Administration says. Lianyungang, like Qingdao, can see vessels held at anchor by fog, and moving a box to another vessel means amending its DG filings.
What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.
For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
The first half of the voyage crosses the North Pacific, where NOAA has recorded hurricane-force mid-latitude storms from October to April, most often in December.
What Anxin does: For October–April sailings we check blocking and bracing on stuffing photos before sealing.
For lithium-ion batteries entered from 1 January 2026 USTR set the Section 301 additional duty on HTSUS 8507.60.0020 (the non-EV line) at 25%, the level EV batteries under 8507.60.0010 reached in 2024. Other China-specific duties can be added and change at short notice, so the classification and the entry date both move the landed cost at Jacksonville.
What Anxin does: We do not give duty rulings. We make sure the invoice describes chemistry, configuration and application precisely enough for the importer's customs broker to classify it, and we flag the entry date when a vessel's arrival could straddle a duty change.
US rules want a numeric emergency response telephone number on the shipping paper for battery cargo that leaves Jacksonville by road, monitored for as long as the goods are in transport and answered by a person with the emergency information for UN3480 or UN3090. A call-back service fails the test (49 CFR 172.604); only the IMDG waiver for cargo that never touches a public highway avoids it.
What Anxin does: Before sailing we confirm who provides the 24-hour number for the US leg, usually the importer's emergency response provider, and put it with the contract reference on the DG documents we send to the trucker.
If a battery container waits at Jacksonville, the demurrage or detention invoice has to arrive within 30 days and carry accurate and sufficient information, or the charge is not owed (46 CFR part 541). The billed party then has at least 30 days to dispute it; in 2025 the D.C. Circuit struck down only the rule on who may be invoiced.
What Anxin does: We keep the dates of discharge, availability and any DG hold for each container, so the importer can check invoices against them and dispute charges inside the FMC time limits.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Lianyungang export filings, the carrier booking and the United States import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| Truck stopped without a monitored emergency number | Road leg from the port | Emergency response provider confirmed before sailing | Importer, checked by Anxin |
Questions
No. The carrier must also send its cargo declaration through AMS 24 hours before loading, and CBP will not issue the permit to unlade without it.
1 June to 30 November, peaking around 10 September, according to the US National Hurricane Center.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Jacksonville before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · United States ports

Share the cargo facts; we review the route in writing.
Request a Quote