Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
North America · sea freight from Lianyungang
Lianyungang to Camden
Yellow Sea · Korea Strait · Tsugaru Strait · Eastern Pacific · Panama Canal · Caribbean Sea · Windward Passage · US East Coast
Lithium batteries for Camden go through Lianyungang port. On the way they face a corridor through the Panama Canal, and they arrive at the port of Camden.
The US side starts with two filings due before loading and ends with a road leg that must carry a live emergency number. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
A Panama Canal corridor whose Neopanamax draft depends on Gatun Lake levels, followed by the Caribbean during hurricane season.


Where this route gets difficult
They run from the Lianyungang terminal through the voyage to Camden and the United States import file.
For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
The Panama Canal Authority sets the maximum draft in the Neopanamax locks according to Gatun Lake levels. In September 2026 it postponed a planned cut from 14.63 m to 14.48 m that was due on 1 October (advisory A-33-2026). A lower limit means ships transiting the new locks can load less.
What Anxin does: We check the canal advisory in force when we quote for Camden and ask carriers to confirm that the booked vessel's routing and any canal surcharge will not change before sailing.
US rules want a numeric emergency response telephone number on the shipping paper for battery cargo that leaves Camden by road, monitored for as long as the goods are in transport and answered by a person with the emergency information for UN3480 or UN3090. A call-back service fails the test (49 CFR 172.604); only the IMDG waiver for cargo that never touches a public highway avoids it.
What Anxin does: Before sailing we confirm who provides the 24-hour number for the US leg, usually the importer's emergency response provider, and put it with the contract reference on the DG documents we send to the trucker.
Besides the importer's ISF, CBP must receive the carrier's electronic cargo declaration through AMS 24 hours before the container is laden in Lianyungang (19 CFR 4.7). CBP does not issue the permit to unlade at Camden until it has that declaration, and late, incomplete or inaccurate cargo data can delay or deny it.
What Anxin does: We give the carrier or NVOCC the final cargo description, HS code, UN number and package count before the documentation cut-off in Lianyungang, so the AMS filing and the DG manifest say the same thing.
US customs rules give an unentered container 15 calendar days at the place of unlading. After that the carrier hands it to a bonded general order warehouse, with transport and storage at the consignee's risk and expense, and for DG cargo that needs specialized storage the port director decides where it is kept (19 CFR 4.37).
What Anxin does: We check with the importer's broker that the entry can be filed before arrival at Camden, and chase any missing invoice or HTS detail while the ship is still at sea.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Lianyungang filings, the booking with the carrier and the documents for United States before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Camden.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| Draft cut reduces capacity or adds surcharges | Panama Canal | Advisory checked at quotation; carrier confirmation | Carrier, checked by Anxin |
| Permit to unlade delayed for a late or inaccurate AMS manifest | Port of discharge | Final cargo data given to the carrier before the cut-off | Carrier / NVOCC, with data from Anxin |
| Truck stopped without a monitored emergency number | Road leg from the port | Emergency response provider confirmed before sailing | Importer, checked by Anxin |
Questions
For lithium-ion batteries classified in HTSUS 8507.60.0020 and entered from 1 January 2026, USTR set the Section 301 additional duty at 25%; EV traction batteries in 8507.60.0010 have been at 25% since 2024. Other duties can apply on top. The importer's customs broker confirms the classification and total duty; we make sure the invoice gives the broker enough detail to do so.
It can. In September 2026 the Panama Canal Authority postponed a planned draft cut in the Neopanamax locks because of Gatun Lake levels (advisory A-33-2026). We check the advisory in force when quoting.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Camden before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · United States ports

Share the cargo facts; we review the route in writing.
Request a Quote