Lianyungang
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
South & Southeast Asia · sea freight from Lianyungang
Lianyungang to Cebu
Yellow Sea · East China Sea · San Bernardino Strait
This route runs out of Lianyungang, where the MSA simplified 'new three' filings in 2024, then follows the monsoon-driven seas of Southeast Asia; at the far end is the port of Cebu.
In the Philippines the importer must be accredited in CPRS before any entry is lodged. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.
A Southeast Asian sea route with no canal: typhoons from summer to autumn, the north-east monsoon from November to March, and relays through Singapore or other hubs for smaller ports.


Where this route gets difficult
In the order the cargo meets them: at the loading port, at sea, at Cebu and at customs in Philippines.
Under Lianyungang MSA's Notice No. 1 of 2024 the cargo side of a 'new three' filing needs four items: safe-carriage declaration, packing certificate signed by an inspector, packaging inspection certificate where the goods are packaged, and a power of attorney. A shorter list puts more weight on each paper, and the packing certificate still requires a certified inspector after supervised stuffing.
What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.
The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, mainly from April to July. At Lianyungang, as at Qingdao, fog can hold vessels at anchor, and a changed vessel means amended DG filings.
What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.
The Japan Meteorological Agency counts an average of 25.1 typhoons a year in the western North Pacific, most of them in August and September. On the run to Cebu a storm can shut the loading port in China or the discharge port for a day or more, and the dangerous goods filings then have to follow the box to its next vessel.
What Anxin does: In typhoon months we check the carrier's DG acceptance for the next two vessels as well, so a rolled container can be refiled quickly rather than rebooked from scratch.
CAO 15-2020 gives consolidators a separate deadline: their manifest is due 24 or 12 hours before arrival, depending on the voyage. LCL battery cargo for Cebu depends on the consolidator having the DG details in time.
What Anxin does: For LCL shipments we pass the DG data to the consolidator at booking, so its manifest is complete before the Philippine cut-off.
A DTI draft technical regulation published in February 2026 would bring power banks under mandatory PS or ICC marking, with a 12-month transition. Importers of power banks through Cebu should follow its progress so that stock arriving after the transition is covered.
What Anxin does: For power bank orders we ask the importer whether it has started on PS or ICC marking, so later shipments are not caught at the end of the transition.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Lianyungang filings, the carrier booking and the Philippines import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| One of the four documents inconsistent with the others | Lianyungang MSA filing | Cross-check before submission | Anxin with the declarant |
| Typhoon closes a port; the box moves to a later vessel | Southeast Asian ports, Jul-Oct | Back-up vessel with DG acceptance; prompt refiling | Anxin with the carrier |
Questions
Only after registering in the Bureau of Customs' CPRS and being accredited.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
Under its Notice No. 1 of 2024, the cargo side submits the DG safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where the goods are packaged, and a power of attorney.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Cebu before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · Philippines ports

Share the cargo facts; we review the route in writing.
Request a Quote