Asia – Indian Ocean
After the Malacca Strait comes the Indian Ocean, where the south-west monsoon and two cyclone seasons decide the pace.
South & Southeast Asia · sea freight from Lianyungang
Lianyungang to Visakhapatnam
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Bay of Bengal
From Lianyungang to Visakhapatnam, cargo moves from northern Jiangsu through Lianyungang on the Yellow Sea, crosses a corridor across the Indian Ocean, and is discharged at the port of Visakhapatnam.
In India the BIS R-number must match the manufacturer, model and factory on crsbis.in. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
After the Malacca Strait comes the Indian Ocean, where the south-west monsoon and two cyclone seasons decide the pace.
India checks BIS registrations online, treats importers as EPR producers and wants the Bill of Entry early.


Where this route gets difficult
Loading port first, then the sea leg, then Visakhapatnam and the India market.
For energy storage shipped on break-bulk vessels, Lianyungang MSA's June 2025 guide classes ESS cabinets as UN3480 and ESS containers as UN3536, recommends 20–50% remaining charge, and requires converters and monitoring switched off, series and parallel circuits disconnected, packages spread evenly with a low centre of gravity, and a safety meeting before the ship arrives.
What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.
Between April and July sea fog is a major marine hazard in the Yellow and Bohai Seas, the China Meteorological Administration says. Lianyungang, like Qingdao, can see vessels held at anchor by fog, and moving a box to another vessel means amending its DG filings.
What Anxin does: In fog season we keep slack between stuffing and the DG cut-off and have the filing data ready to amend.
India's southwest monsoon runs from June to September, with rough seas across the Arabian Sea and Bay of Bengal. Rough seas are hard on poorly braced loads.
What Anxin does: In monsoon months we check blocking and bracing strictly on stuffing photos before sealing.
Visakhapatnam handled 91.17 million tonnes in 2025-26, up 10.34 %, with coastal cargo at 25.86 million tonnes beside 65.30 million tonnes overseas (Ministry of Ports, Shipping and Waterways). For Visakhapatnam, the box from Lianyungang should be booked with the import terminal and the consignee's customs broker confirmed.
What Anxin does: Before the box from Lianyungang sails, we check the routing to Visakhapatnam with the carrier and share the final documents with the consignee.
Indian customs expect the Bill of Entry by the end of the day before the vessel arrives at Visakhapatnam; it can be filed up to 30 days ahead, and late filing attracts charges. The BIS and DG details must be ready by then.
What Anxin does: We send the importer's broker the invoice, packing list and BIS details as soon as the ship sails from Lianyungang, so the Bill of Entry can be filed early.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Lianyungang filings, the carrier booking and the India import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| ESS unit not isolated or poorly distributed in a break-bulk hold | Lianyungang, break-bulk loading | Manufacturer's written isolation steps; safety meeting | Manufacturer / ship, coordinated by Anxin |
| Late Bill of Entry charges | Indian port of discharge | Documents sent at sailing | Importer's broker |
Questions
Yes. They fall under BIS's Compulsory Registration Scheme (IS 16046 Part 2), and the R-number is declared in the Bill of Entry.
The India Meteorological Department describes two North Indian Ocean seasons, April–May and October–December, the latter being the main one.
Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Lianyungang → Visakhapatnam before any booking, and ask for missing battery documents first.
All destinations from Lianyungang · India ports

Share the cargo facts; we review the route in writing.
Request a Quote