Lithium battery freight focus Air · Sea · Land assessment Document-first planning

South & Southeast Asia · sea freight from Lianyungang

Shipping from Lianyungang to Jawaharlal Nehru Port

Lianyungang to Jawaharlal Nehru Port

Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Malacca Strait · Andaman Sea · Indian Ocean

Sea corridor illustration: Lianyungang to Jawaharlal Nehru Port, India Simplified map with a curved corridor from Lianyungang via Yellow Sea, East China Sea, Taiwan Strait, South China Sea, Malacca Strait, Andaman Sea, Indian Ocean to Jawaharlal Nehru Port. Illustration only; not a vessel track or schedule. CHINAINDIASOUTH CHINA SEA Taiwan StraitSingapore / MalaccaSouth of Sri Lanka LianyungangCHINA ORIGIN Jawaharlal Nehru PortINDIA LianyungangYELLOW SEASHANDONGJIANGSUDEPARTURE AREA
  1. LianyungangChina origin
  2. Yellow Sea
  3. East China Sea
  4. Taiwan Strait
  5. South China Sea
  6. Malacca Strait
  7. Andaman Sea
  8. Indian Ocean
  9. Jawaharlal Nehru PortIndia
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

Lithium batteries for Jawaharlal Nehru Port go out of Lianyungang, where the MSA simplified 'new three' filings in 2024. On the way they face an Indian Ocean passage after the Malacca Strait, and they arrive at the port of Jawaharlal Nehru Port.

In India the BIS R-number must match the manufacturer, model and factory on crsbis.in. The 5 points below are particular to this lane; each comes with what we do and the paperwork it touches.

What we need to start

  • Break-bulk ESS guide
  • Fog season Apr–Jul
  • CPCB EPR
  • Advance Bill of Entry
  • BIS CRS

Route profile

What sets Lianyungang → Jawaharlal Nehru Port apart

Sea corridor

Asia – Indian Ocean

An Indian Ocean crossing whose season depends on the side: the southwest monsoon and two cyclone seasons in the north, a November–April cyclone season in the south-west, and piracy off Somalia.

Import country

India

BIS registration verified model by model, EPR registration for importers, and a Bill of Entry due before the ship arrives.

Aerial view over the Port of Lianyungang with berths, rail lines and cargo yards
A cargo ship at anchor in calm water under a clear sky

Where this route gets difficult

5 points to plan for on the Lianyungang → Jawaharlal Nehru Port route

Listed from loading in Lianyungang to import into India, each with what we do about it.

  1. Origin port

    Energy storage on break-bulk ships: Lianyungang's own rules

    Lianyungang MSA's June 2025 guide for ESS on break-bulk ships treats ESS cabinets as UN3480 and ESS containers as UN3536, recommends a remaining charge of 20–50%, and requires converters and monitoring to be powered off, series and parallel circuits disconnected, packages evenly spread with a low centre of gravity, and a safety meeting before the ship arrives.

    What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.

  2. Sea corridor

    Many Indian-bound boxes relay through Colombo

    Colombo handled a record 8.29 million TEU in 2025, about 81% of it transhipment, and roughly 45% of that transhipment is linked to Indian trade. A container for Jawaharlal Nehru Port may well be discharged in Colombo and reloaded onto a feeder, so the DG declaration and the booking have to cover both vessels.

    What Anxin does: We ask the carrier at booking whether the service to Jawaharlal Nehru Port relays in Colombo or elsewhere, and check that the DG acceptance covers the feeder leg too.

  3. Import country

    Bill of lading, invoice-cum-packing list and Bill of Entry

    An Indian import needs the bill of lading, the invoice cum packing list and the Bill of Entry. For Jawaharlal Nehru Port, the Lianyungang papers must agree with each other.

    What Anxin does: We make sure the bill of lading, invoice and packing list from Lianyungang carry one battery description.

  4. Import country

    Importers are battery producers under EPR

    India's Battery Waste Management Rules 2022 treat importers as producers. The importer of batteries through Jawaharlal Nehru Port must register with the CPCB and meet its extended producer responsibility obligations before selling them.

    What Anxin does: At quotation we ask the importer for its CPCB producer registration, so the EPR point is settled before the first shipment.

  5. Import country

    Jawaharlal Nehru Port (JNPA): 92 % overseas cargo in 2025-26

    India's Ministry of Ports reports 102.01 million tonnes at Jawaharlal Nehru Port (JNPA) in 2025-26 (+10.74 %), 93.43 million tonnes of it overseas. For Jawaharlal Nehru Port, the box from Lianyungang enters a mainly international flow, so the Bill of Entry data should reach the consignee's broker before arrival.

    What Anxin does: We confirm the discharge terminal for the box from Lianyungang with the carrier and pass it to the consignee's broker at Jawaharlal Nehru Port.

Locator map of Jawaharlal Nehru Port, IndiaJawaharlal Nehru Port
Locator map in the same projection as the corridor map; the dot marks the listed port position (18.95°N, 72.95°E).
Container ship and stacked containers at the Port of Colombo

Documents & compliance

Checklist for Lianyungang → Jawaharlal Nehru Port

Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

Before loading in Lianyungang

  • For ESS: UN3480 or UN3536 confirmed, state of charge and circuit isolation stated in writing
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)

For the carrier and the voyage

  • Carrier's revised arrival reconfirmed in the cyclone season before booking onward transport
  • UN 38.3 test summary for every cell and battery type
  • Dangerous goods declaration with UN number (3480 / 3481 / 3090 / 3091), proper shipping name and packing instruction (P903, or P908/P911 for damaged)

At the India end

  • Importer's CPCB producer registration
  • Documents with the broker in time for the advance Bill of Entry
An electric bicycle with its battery mounted on the frame
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Lianyungang export filings, the carrier booking and the India import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

What could go wrong from Lianyungang to Jawaharlal Nehru Port, and who acts

RiskWhereMitigationWho acts
ESS unit not isolated or poorly distributed in a break-bulk holdLianyungang, break-bulk loadingManufacturer's written isolation steps; safety meetingManufacturer / ship, coordinated by Anxin

Questions

Questions about shipping from Lianyungang to Jawaharlal Nehru Port

Yes. They fall under BIS's Compulsory Registration Scheme (IS 16046 Part 2), and the R-number is declared in the Bill of Entry.

Often, yes. Colombo is the main relay for Indian cargo, so we ask the carrier where the service relays and check that the feeder accepts the batteries too.

Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Lianyungang
  5. 5ImportClearance at Jawaharlal Nehru Port
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Lianyungang → Jawaharlal Nehru Port

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Lianyungang → Jawaharlal Nehru Port before any booking, and ask for missing battery documents first.

All destinations from Lianyungang · India ports

Trailers backed up to the loading docks of a warehouse

Need Lianyungang → Jawaharlal Nehru Port reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp