Lithium battery freight focus Air · Sea · Land assessment Document-first planning

Latin America & Caribbean · sea freight from Lianyungang

Shipping from Lianyungang to Pointe-à-Pitre

Lianyungang to Pointe-à-Pitre

Yellow Sea · Korea Strait · Sea of Japan · Tsugaru Strait · North Pacific · Eastern Pacific · Panama Canal · Caribbean Sea

Sea corridor illustration: Lianyungang to Pointe-à-Pitre, Guadeloupe Simplified map with a curved corridor from Lianyungang via Yellow Sea, Korea Strait, Sea of Japan, Tsugaru Strait, North Pacific, Eastern Pacific, Panama Canal, Caribbean Sea to Pointe-à-Pitre. Illustration only; not a vessel track or schedule. CHINANORTH AMERICASOUTH AMERICANORTH ATLANTICPACIFIC OCEAN Tsugaru StraitNorth PacificPanama Canal LianyungangCHINA ORIGIN Pointe-à-PitreGUADELOUPE LianyungangYELLOW SEASHANDONGJIANGSUDEPARTURE AREA
  1. LianyungangChina origin
  2. Yellow Sea
  3. Korea Strait
  4. Sea of Japan
  5. Tsugaru Strait
  6. North Pacific
  7. Eastern Pacific
  8. Panama Canal
  9. Caribbean Sea
  10. Pointe-à-PitreGuadeloupe
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

This route runs from northern Jiangsu through Lianyungang on the Yellow Sea, then follows a Pacific crossing and a Panama Canal transit; at the far end is the port of Pointe-à-Pitre.

On the Guadeloupe side the declaration and the octroi de mer set the pace. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.

What we need to start

  • Fog season Apr–Jul
  • Lianyungang export
  • Octroi de mer
  • Customs declaration

Route profile

The Lianyungang → Pointe-à-Pitre route in brief

Origin port

Lianyungang

Jiangsu's Yellow Sea port, with a simplified document list for 'new three' cargo since 2024 and its own guide for energy-storage units on break-bulk ships.

Sea corridor

Asia – Americas via the Panama Canal

Gatun Lake levels set how much a ship can load through Panama; the Caribbean leg then crosses hurricane waters from June to November.

Aerial view over the Port of Lianyungang with berths, rail lines and cargo yards
A container ship under way off the Guatemalan coast

Where this route gets difficult

5 points to plan for on the Lianyungang → Pointe-à-Pitre route

Listed from loading in Lianyungang to import into Guadeloupe, each with what we do about it.

  1. Origin port

    Energy storage on break-bulk ships: Lianyungang's own rules

    Lianyungang MSA's June 2025 guide for ESS on break-bulk ships treats ESS cabinets as UN3480 and ESS containers as UN3536, recommends a remaining charge of 20–50%, and requires converters and monitoring to be powered off, series and parallel circuits disconnected, packages evenly spread with a low centre of gravity, and a safety meeting before the ship arrives.

    What Anxin does: For ESS units we confirm the UN number the unit ships under, get the state of charge and isolation steps in writing from the manufacturer, and join the pre-arrival safety meeting with the stowage details.

  2. Origin port

    A shorter document list at Lianyungang, not a shorter check

    Lianyungang MSA's Notice No. 1 of 2024 cut the materials for 'new three' cargo to four on the cargo side: the safe-carriage declaration, the inspector-signed packing certificate, the packaging inspection certificate where packaged, and a power of attorney. Fewer papers means each one carries more weight; the packing certificate still has to be signed by a certified inspector after supervised stuffing.

    What Anxin does: We prepare the four cargo-side documents together and check that the packing certificate, the packaging certificate and the declaration describe the same UN numbers and quantities.

  3. Sea corridor

    The Pacific leg before Panama in winter

    The first half of the voyage crosses the North Pacific, where NOAA has recorded hurricane-force mid-latitude storms from October to April, most often in December.

    What Anxin does: For October–April sailings we check blocking and bracing on stuffing photos before sealing.

  4. Import country

    Freight is handled at Jarry, not in Pointe-à-Pitre itself

    The Jarry / Baie-Mahault site carries 97% of the Grand Port Maritime de la Guadeloupe's freight traffic, and the port handled 206,844 TEU in 2025. The carrier should confirm the terminal's acceptance of the battery class for Pointe-à-Pitre.

    What Anxin does: We ask the carrier to confirm acceptance at Pointe-à-Pitre for the box from Lianyungang.

  5. Import country

    An exemption cannot be added after clearance

    An octroi de mer exemption has to be requested on the declaration at clearance, with the attestation. For Pointe-à-Pitre, the consignee should settle that before Lianyungang sails.

    What Anxin does: We ask the consignee whether it is claiming an exemption for Pointe-à-Pitre and ask for the attestation to be ready.

Locator map of Pointe-à-Pitre, GuadeloupePointe-à-Pitre
Locator map in the same projection as the corridor map; the dot marks the listed port position (16.23°N, 61.53°W).
Cartagena container port and city seen from La Popa hill

Documents & compliance

What to have ready: Lianyungang to Pointe-à-Pitre

These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

Before loading in Lianyungang

  • The four cargo-side documents under Lianyungang MSA Notice 2024 No. 1 prepared together and cross-checked
  • For ESS: UN3480 or UN3536 confirmed, state of charge and circuit isolation stated in writing
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)

For the shipping line

  • Canal routing and any canal-related surcharge confirmed for the booked vessel
  • Condition statement: new, used, damaged/defective (SP376) or for recycling (SP377)
  • UN 38.3 test summary for every cell and battery type

At the Guadeloupe end

  • Tariff, value and any exemption attestation prepared for the declaration
An electric bicycle with its battery mounted on the frame
Before you book

Match the details first

We line up UN numbers, model names and package counts across the Lianyungang filings, the booking with the carrier and the documents for Guadeloupe before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Pointe-à-Pitre.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

What could go wrong from Lianyungang to Pointe-à-Pitre, and who acts

RiskWhereMitigationWho acts
One of the four documents inconsistent with the othersLianyungang MSA filingCross-check before submissionAnxin with the declarant
ESS unit not isolated or poorly distributed in a break-bulk holdLianyungang, break-bulk loadingManufacturer's written isolation steps; safety meetingManufacturer / ship, coordinated by Anxin
Exemption not claimed at clearanceFrench CustomsAttestation prepared before arrivalConsignee's declarant

Questions

Common questions on the Lianyungang → Pointe-à-Pitre route

Yes. The external octroi de mer applies to imports whatever their origin and is assessed on the customs declaration.

1 June to 30 November, peaking around 10 September, according to the US National Hurricane Center.

Its June 2025 break-bulk ESS guide recommends 20–50% remaining charge, with converters and monitoring off and circuits disconnected.

References

Regulations and port sources cited

  1. Circulaire du 10 juillet 2025 relative au régime de l'octroi de mer et de l'octroi de mer régional (Direction générale des douanes et droits indirects (France))
  2. Démarche: importer un bien dans un DROM (Direction générale des douanes et droits indirects (France))
  3. Suivi de l'activité portuaire, bilan 2025 (Grand Port Maritime de la Guadeloupe)
  4. Port de Jarry / Baie-Mahault (Grand Port Maritime de la Guadeloupe)
  5. Advisory to Shipping A-33-2026: Postponement of maximum authorized draft adjustment in the Neopanamax locks (Panama Canal Authority)
  6. Tropical Cyclone Climatology (NOAA National Hurricane Center)
  7. Hurricane force extratropical cyclones observed using QuikSCAT (Mariners Weather Log 49-1) (NOAA Ocean Prediction Center)

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Lianyungang
  5. 5ImportClearance at Pointe-à-Pitre
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Lianyungang → Pointe-à-Pitre

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Lianyungang → Pointe-à-Pitre before any booking, and ask for missing battery documents first.

All destinations from Lianyungang · Guadeloupe ports

Trailers backed up to the loading docks of a warehouse

Need Lianyungang → Pointe-à-Pitre reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp