Guangzhou (Nansha)
Pearl River Delta battery cargo through Nansha, where a September 2026 agreement lets Dongguan-inspected containers load without a second MSA check, and where typhoon season runs June to October.
South & Southeast Asia · sea freight from Guangzhou
Guangzhou to Vizhinjam
South China Sea · Malacca Strait · Andaman Sea · Indian Ocean
From Guangzhou to Vizhinjam, cargo moves out of Nansha, at the mouth of the Pearl River, crosses the Malacca Strait and then the Indian Ocean, and is discharged at the port of Vizhinjam.
In India the BIS R-number must match the manufacturer, model and factory on crsbis.in. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
Pearl River Delta battery cargo through Nansha, where a September 2026 agreement lets Dongguan-inspected containers load without a second MSA check, and where typhoon season runs June to October.
An Indian Ocean route: rough south-west monsoon seas from June to September and cyclone windows in April-May and October-December.


Where this route gets difficult
Loading port first, then the sea leg, then Vizhinjam and the India market.
Dongguan Customs and Dongguan MSA began sharing dangerous-goods packaging certificate data in September 2026, which they called a first in China, and agreed joint action on concealed and false declarations; Huangpu Customs runs a joint 'lithium batteries going overseas' service against misdeclaration as well. A mismatch between packaging certificate and MSA filing is visible to both.
What Anxin does: We check that the UN number, packaging code and quantities on the packaging certificate are exactly those on the MSA cargo report before either is submitted.
At a July 2024 meeting on energy-storage carriage, Nansha MSA recommended shipping ESS batteries at a state of charge of around 25% and preventing accidental activation. It is a recommendation rather than a fixed rule, but it is the figure the local authority has put on record.
What Anxin does: For ESS cargo leaving Nansha we ask the manufacturer to state the shipping state of charge and the anti-activation measures in writing, and put both in the documents the carrier sees.
India's southwest monsoon runs from June to September, with rough seas across the Arabian Sea and Bay of Bengal. Rough seas are hard on poorly braced loads.
What Anxin does: In monsoon months we check blocking and bracing strictly on stuffing photos before sealing.
IMD puts the normal monsoon onset over Kerala at 1 June; in 2026 it came on 4 June and then spread north, reaching the whole country around mid-July. Battery cartons arriving at Vizhinjam in this period need to stay dry through discharge and delivery.
What Anxin does: For monsoon-season arrivals at Vizhinjam we ask for cartons with moisture protection and tell the consignee to plan unstuffing under cover.
India requires lithium-ion cells and batteries to be registered under BIS's CRS (IS 16046 Part 2) before import. The registration number is declared in the Bill of Entry, so a missing or wrong number stops the container at Vizhinjam.
What Anxin does: Before booking we ask for the manufacturer's BIS R-number and check that it covers the models and factory named in the shipment.

Documents & compliance
These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

We line up UN numbers, model names and package counts across the Guangzhou filings, the booking with the carrier and the documents for India before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Vizhinjam.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Mismatch between packaging certificate and MSA filing flagged by shared data | Dongguan / Nansha | Line-by-line check before submission | Anxin with the declarant |
Questions
By the end of the day before the vessel arrives; it may be filed up to 30 days in advance.
Often, yes. Colombo is the main relay for Indian cargo, so we ask the carrier where the service relays and check that the feeder accepts the batteries too.
Nansha MSA has recommended around 25% for ESS batteries and measures against accidental activation. Treat it as the local authority's recommendation; the carrier's own acceptance conditions also apply.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Guangzhou → Vizhinjam before any booking, and ask for missing battery documents first.
All destinations from Guangzhou · India ports

Share the cargo facts; we review the route in writing.
Request a Quote