Asia – Southeast Asian seas
A Southeast Asian sea route with no canal: typhoons from summer to autumn, the north-east monsoon from November to March, and relays through Singapore or other hubs for smaller ports.
South & Southeast Asia · sea freight from Dalian
Dalian to Hai Phong
Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Gulf of Tonkin
This route runs through Dayaowan, where Liaoning's first JT/T 1543 lithium export sailed in May 2025, then follows a Southeast Asian sea passage with no canal on the way; at the far end is the port of Hai Phong.
Vietnam adds an e-manifest and DG declaration due 12 hours before arrival on short voyages. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
A Southeast Asian sea route with no canal: typhoons from summer to autumn, the north-east monsoon from November to March, and relays through Singapore or other hubs for smaller ports.
Vietnam's filings come early, its EPR rules reach importers, and storms close ports on this coast.


Where this route gets difficult
Loading port first, then the sea leg, then Hai Phong and the Vietnam market.
The China Meteorological Administration describes sea fog as a major marine hazard in the Yellow and Bohai Seas, with the season mainly from April to July, seriously affecting sea transport. Fog holds keep vessels at anchor, and a late vessel can push the box past its documented sailing.
What Anxin does: In the fog season we avoid tight stuffing-to-cut-off gaps and keep the filing data ready to amend if the vessel changes.
Liaoning's first lithium battery export under JT/T 1543 sailed from Dayaowan on 4 May 2025, and Dalian MSA counted 885 TEU of lithium batteries exported in the first four months of that year. Carriers should not accept batteries that do not meet JT/T 1543, and with a thinner flow there are fewer sailings to fall back on if a booking is refused.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
Routes from northern China to Hai Phong go through the Taiwan Strait, whose funnel effect makes winds 1-2 Beaufort levels stronger than outside. In winter and spring the north-east monsoon brings force 7 or more on about two-thirds of days, which is hard on a load that has not been braced.
What Anxin does: We ask for blocking and bracing photos before the container is closed in Dalian, checked against the CINS stuffing guidance for lithium batteries.
Vietnam now wants the manifest, B/L data and DG declaration 12 hours before arrival for short voyages and 24 hours for longer ones (Decree 08/2015 as amended in 2025). For a container from Dalian to Hai Phong, errors found after that point hold the box.
What Anxin does: We send the carrier the full DG description with the booking, so the Vietnamese filing can go in on time without corrections.
Vietnam checks lithium batteries for phones, tablets and laptops against QCVN 101: inspection registration, testing and a declaration of conformity are needed before sale. Importers receiving them at Hai Phong should start early.
What Anxin does: For consumer batteries we ask the importer to start the QCVN 101 registration before the goods leave Dalian, using test data from the manufacturer.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

We line up UN numbers, model names and package counts across the Dalian filings, the booking with the carrier and the documents for Vietnam before the booking is confirmed, so that a mismatch is fixed at origin rather than discovered at Hai Phong.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Fog hold delays the vessel; filings need amending | Yellow Sea, Apr–Jul | Amendment-ready filing data | Anxin with the declarant |
| Container held for a late or corrected DG declaration | Vietnamese port of discharge | DG data final at booking | Carrier, with data from Anxin |
Questions
Producers and importers, who must recycle or contribute to the Vietnam Environment Protection Fund under Decree 05/2025.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Hai Phong before any booking, and ask for missing battery documents first.
All destinations from Dalian · Vietnam ports

Share the cargo facts; we review the route in writing.
Request a Quote