Lithium battery freight focus Air · Sea · Land assessment Document-first planning
Shipment Status & Support

North America · sea freight from Dalian

Shipping from Dalian to Searsport

Dalian to Searsport

Yellow Sea · Korea Strait · Tsugaru Strait · Eastern Pacific · Panama Canal · Caribbean Sea · Windward Passage · US East Coast

Sea corridor illustration: Dalian to Searsport, United States Simplified map with a curved corridor from Dalian via Yellow Sea, Korea Strait, Tsugaru Strait, Eastern Pacific, Panama Canal, Caribbean Sea, Windward Passage, US East Coast to Searsport. Illustration only; not a vessel track or schedule. CHINANORTH AMERICASOUTH AMERICAPACIFIC OCEAN Tsugaru StraitNorth PacificPanama Canal DalianCHINA ORIGIN SearsportUNITED STATES DalianBOHAI SEAYELLOW SEASHANDONGDEPARTURE AREA
  1. DalianChina origin
  2. Yellow Sea
  3. Korea Strait
  4. Tsugaru Strait
  5. Eastern Pacific
  6. Panama Canal
  7. Caribbean Sea
  8. Windward Passage
  9. US East Coast
  10. SearsportUnited States
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

Lithium batteries for Searsport go out of Dalian, the north-east's gateway on the Yellow Sea. On the way they face the Pacific, the Panama Canal and the Caribbean, and they arrive at the port of Searsport.

The US side adds a 25% Section 301 duty line, forced-labour scrutiny of lithium supply chains and an ISF deadline that falls before loading. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.

What we need to start

  • Winter ice & spring fog
  • Dalian Dayaowan export
  • Supply-chain tracing file
  • HTS code 8507.60
  • ISF filer

Route profile

How Dalian → Searsport differs from other lanes

Sea corridor

Asia – Americas via the Panama Canal

A Panama Canal corridor whose Neopanamax draft depends on Gatun Lake levels, followed by the Caribbean during hurricane season.

Import country

United States

Section 301 duty on Chinese lithium-ion batteries at 25% since January 2026, UFLPA scrutiny of lithium supply chains, ISF 24 hours before loading, and a US-only marking rule for SP188 packages.

Blue harbour crane booms above a quay building in Dalian harbour
A container ship under way off the Guatemalan coast

Where this route gets difficult

5 points to plan for on the Dalian → Searsport route

They run from the Dalian terminal through the voyage to Searsport and the United States import file.

  1. Origin port

    Ice in the northern Yellow Sea from January

    Sea ice forms every winter in the Bohai Sea and northern Yellow Sea. In winter 2021/22 China's marine forecast centre expected floating ice about 15 nautical miles out in the northern Yellow Sea, where Dalian's Dayaowan lies, and about 60 in Liaodong Bay, peaking from mid-January to mid-February.

    What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.

  2. Sea corridor

    North Atlantic winter storms off the US East Coast

    The last leg north to Searsport runs up the US East Coast in the North Atlantic, where NOAA's Ocean Prediction Center has recorded hurricane-force mid-latitude storms in every month from October to April, most often in January.

    What Anxin does: For October–April arrivals we check blocking and bracing on stuffing photos before sealing, and allow slack in the delivery plan.

  3. Import country

    A monitored US emergency number for the truck leg

    The IMDG waiver in 49 CFR 171.25(d)(2) spares the emergency telephone number only when cargo stays on the ship or moves between vessels without using a public highway. Once the container is trucked out of Searsport, the shipping paper needs a numeric emergency response number that is monitored at all times and answered by someone who knows the material; an answering service that calls back does not count. Goods shipped as 'Battery powered equipment' are exempt.

    What Anxin does: Before sailing we confirm who provides the 24-hour number for the US leg, usually the importer's emergency response provider, and put it with the contract reference on the DG documents we send to the trucker.

  4. Import country

    Product defects must be reported to CPSC within 24 hours

    US importers, like manufacturers and retailers, must tell CPSC within 24 hours once they have information reasonably suggesting that a consumer product fails a safety rule or has a defect that could create a substantial hazard. Battery overheating reports from customers can trigger that duty, and CPSC expects any investigation to take no more than about 10 working days.

    What Anxin does: We keep the manufacturer's batch records, UN 38.3 summaries and packing photos for each shipment to Searsport, so the importer can answer CPSC questions quickly.

  5. Import country

    CPSC certificate data now filed at entry

    Since 8 July 2026, importers of consumer products that are subject to a CPSC certification requirement must electronically file the certificate data at entry; goods entered from a Foreign Trade Zone follow on 8 January 2027. Whether a battery-powered product is caught depends on the rules that apply to that product, not on the battery alone.

    What Anxin does: We ask whether the goods are consumer products that need a CPSC certificate and, if so, who files it, so that the question is settled before the goods arrive.

Locator map of Searsport, United StatesSearsport
Locator map in the same projection as the corridor map; the dot marks the listed port position (44.45°N, 68.92°W).
Containers on rail wagons next to a terminal in Vancouver

Documents & compliance

Documents to line up for Dalian → Searsport

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

In Dalian, before the box is loaded

  • 'Made in China' marking on articles or containers checked on photos
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report
  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable

For the carrier and the voyage

  • Canal routing and any canal-related surcharge confirmed for the booked vessel
  • SP188 cartons: US 'forbidden aboard passenger aircraft' marking or CAO label
  • UN 38.3 test summary for every cell and battery type

At the United States end

  • CPSC certificate data and eFiling arrangement, if the product is subject to certification
  • ISF filer named; stuffing location and consolidator sent right after packing
  • HTSUS classification from the broker (8507.60.0010 vs .0020 decides the Section 301 line)
A portable power bank connected to a smartphone
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Dalian export filings, the carrier booking and the United States import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risks on this route and who deals with them

RiskWhereMitigationWho acts
Ice delays berthing in mid-winterNorthern Yellow Sea, Jan–FebExtra time before cut-off; schedule reconfirmedCarrier, monitored by Anxin
Truck stopped without a monitored emergency numberRoad leg from the portEmergency response provider confirmed before sailingImporter, checked by Anxin

Questions

Dalian → Searsport: questions we are asked

Yes. Under 49 CFR 171.25(b)(3), SP188 packages of UN3480 or UN3090 need the 'FORBIDDEN FOR TRANSPORT ABOARD PASSENGER AIRCRAFT' marking or a Cargo Aircraft Only label, and so do packages of batteries packed with or contained in equipment above 5 kg net. We check for it on carton photos before stuffing.

1 June to 30 November, peaking around 10 September, according to the US National Hurricane Center.

Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Dalian
  5. 5ImportClearance at Searsport
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Dalian → Searsport

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Dalian → Searsport before any booking, and ask for missing battery documents first.

All destinations from Dalian · United States ports

Workers loading cartons from pallets by hand in a warehouse

Need Dalian → Searsport reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp