Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
Europe · sea freight from Dalian
Dalian to Aliaga
Yellow Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Mediterranean Sea · Aegean Sea
This route runs out of Dalian, the north-east's gateway on the Yellow Sea, then follows a Suez corridor that Mediterranean services are using again more than any other Asia–Europe lane; at the far end is the port of Aliaga.
Türkiye wants the entry summary declaration 24 hours before the container is loaded in China. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
Mediterranean services are the ones most likely to use Suez again (57% in September 2026), which puts the cargo back through Bab el-Mandeb, rated a SUBSTANTIAL threat.


Where this route gets difficult
Loading port first, then the sea leg, then Aliaga and the Turkey market.
Liaoning's first lithium battery export under JT/T 1543 sailed from Dayaowan on 4 May 2025, and Dalian MSA counted 885 TEU of lithium batteries exported in the first four months of that year. Carriers should not accept batteries that do not meet JT/T 1543, and with a thinner flow there are fewer sailings to fall back on if a booking is refused.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
Sea ice forms every winter in the Bohai Sea and northern Yellow Sea. In winter 2021/22 China's marine forecast centre expected floating ice about 15 nautical miles out in the northern Yellow Sea, where Dalian's Dayaowan lies, and about 60 in Liaodong Bay, peaking from mid-January to mid-February.
What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.
The JMIC's September 2026 update put the northern Red Sea and the Suez Canal at MODERATE, with two-way transits and container lines selectively returning, and the Eastern Mediterranean at LOW. On this corridor the exposure lies at the southern entrance of the Red Sea, not at the canal itself.
What Anxin does: We check before each booking whether the service has changed routing since the last quote.
Türkiye applies its own advance filing: for containerised sea cargo the entry summary declaration (özet beyan) must reach the customs office where the goods will be discharged at least 24 hours before the container is loaded at the departure port. The carrier must make sure third-party filers meet the deadline, so incomplete data at Dalian can keep the box off the ship.
What Anxin does: We give the carrier or filer the consignee details, HS-level description and DG data at booking, well before the Dalian cut-off.
Battery importers in Türkiye have to join TAP, the Ministry-authorised association for portable battery producers and importers, or its system. TAP's board decides within 30 days; only then can the importer apply through TAREKS for the Ministry's environmental compliance permit (Çevre Uyum İzni).
What Anxin does: Before booking we ask the Turkish importer for its TAP membership and permit status, so a first-time importer starts the 30-day process before the goods leave Dalian.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the Turkey import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Ice delays berthing in mid-winter | Northern Yellow Sea, Jan–Feb | Extra time before cut-off; schedule reconfirmed | Carrier, monitored by Anxin |
| Entry summary late and the box is not loaded | Loading port, Dalian | Filing data passed at booking | Carrier / filer |
| Importer not in a collection system; no environmental permit | Turkish importer | TAP and permit status checked before booking | Importer |
Questions
At least 24 hours before the container is loaded at the departure port in China, filed electronically to the customs office of discharge.
Often: in September 2026, 57% of Asia–Mediterranean services used the Red Sea routing. Bab el-Mandeb was rated a SUBSTANTIAL threat by the JMIC on 24 September 2026, so we confirm each service's routing before booking.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Aliaga before any booking, and ask for missing battery documents first.
All destinations from Dalian · Turkey ports

Share the cargo facts; we review the route in writing.
Request a Quote