Lithium battery freight focus Air · Sea · Land assessment Document-first planning
Shipment Status & Support

Europe · sea freight from Dalian

Shipping from Dalian to Ponta Delgada

Dalian to Ponta Delgada

Yellow Sea · Taiwan Strait · Malacca Strait · Indian Ocean · Bab-el-Mandeb · Suez Canal · Sicily Channel · Strait of Gibraltar

Sea corridor illustration: Dalian to Ponta Delgada, Portugal Simplified map with a curved corridor from Dalian via Yellow Sea, Taiwan Strait, Malacca Strait, Indian Ocean, Bab-el-Mandeb, Suez Canal, Sicily Channel, Strait of Gibraltar to Ponta Delgada. Illustration only; not a vessel track or schedule. CHINAINDIAAFRICAEUROPECENTRAL ASIAINDIAN OCEAN Taiwan StraitSingapore / MalaccaBab-el-MandebSuez CanalGibraltar DalianCHINA ORIGIN Ponta DelgadaPORTUGAL DalianBOHAI SEASHANDONGDEPARTURE AREA
  1. DalianChina origin
  2. Yellow Sea
  3. Taiwan Strait
  4. Malacca Strait
  5. Indian Ocean
  6. Bab-el-Mandeb
  7. Suez Canal
  8. Sicily Channel
  9. Strait of Gibraltar
  10. Ponta DelgadaPortugal
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

From Dalian to Ponta Delgada, cargo moves through Dayaowan, crosses a Bab el-Mandeb and Suez passage into the Mediterranean, and is discharged at the port of Ponta Delgada.

Portugal registers battery producers with APA on SILiAmb. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.

What we need to start

  • Winter ice & spring fog
  • Dalian Dayaowan export
  • SILiAmb / APA registration
  • Portuguese-language safety information
  • Consignee EORI

Route profile

The Dalian → Ponta Delgada route in brief

Origin port

Dalian (Dayaowan)

North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.

Sea corridor

Asia – Mediterranean via Suez

Mediterranean services are the ones most likely to use Suez again (57% in September 2026), which puts the cargo back through Bab el-Mandeb, rated a SUBSTANTIAL threat.

Blue harbour crane booms above a quay building in Dalian harbour
A loaded container ship on the horizon

Where this route gets difficult

Where Dalian → Ponta Delgada shipments get held up: 5 points

They run from the Dalian terminal through the voyage to Ponta Delgada and the Portugal import file.

  1. Origin port

    Ice in the northern Yellow Sea from January

    Sea ice forms every winter in the Bohai Sea and northern Yellow Sea. In winter 2021/22 China's marine forecast centre expected floating ice about 15 nautical miles out in the northern Yellow Sea, where Dalian's Dayaowan lies, and about 60 in Liaodong Bay, peaking from mid-January to mid-February.

    What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.

  2. Sea corridor

    If the service goes round Africa instead

    The 43% of Mediterranean services not using the Red Sea sail round the Cape of Good Hope, then back through Gibraltar. SAMSA estimates about 200 of the 576 containers lost at sea in 2024 went overboard near the Cape, 35% of the year's total.

    What Anxin does: On Cape sailings we apply the CINS blocking and bracing checks strictly on stuffing photos before sealing.

  3. Import country

    Safety documentation for stationary storage systems

    Since 18 August 2024 a stationary battery energy storage system placed on the EU market must be safe in normal operation, and its technical documentation must show testing against the Annex V safety parameters, from thermal shock and short-circuit protection to over-discharge and thermal propagation. Buyers of ESS cabinets in Portugal increasingly ask for that file before delivery.

    What Anxin does: For ESS cabinets and racks bound for Portugal we ask the manufacturer to confirm that the Annex V test documentation exists before booking and note the answer in the shipment file.

  4. Import country

    The ICS2 entry summary is due before loading in Dalian

    Sea cargo for the EU needs a complete Entry Summary Declaration under ICS2 Release 3, and for deep-sea containers it is due 24 hours before loading at the departure port. Carriers apply 'no manifest, no load', and a filing without a valid EORI number is rejected, so a data gap in Dalian leaves the box on the quay.

    What Anxin does: We collect the consignee's EORI number, an HS-level goods description and the house-bill parties at booking, and make sure the party filing the ENS has them before the Dalian cut-off.

  5. Import country

    User-replaceable batteries in appliances from 18 February 2027

    Article 11 of the Battery Regulation says that from 18 February 2027 portable batteries inside appliances must be readily removable and replaceable by the end-user using commercially available tools, without heat or solvents, except under limited derogations. Appliances sold in Portugal after that date need a design that complies.

    What Anxin does: When appliances with built-in batteries are booked for Portugal we point the importer to the February 2027 date so the manufacturer answers the design question before shipment; we do not assess compliance.

Locator map of Ponta Delgada, PortugalPonta Delgada
Locator map in the same projection as the corridor map; the dot marks the listed port position (37.73°N, 25.67°W).
Container ship alongside blue gantry cranes at the Juan Carlos I dock, Algeciras

Documents & compliance

Documents to line up for Dalian → Ponta Delgada

These documents come from the shipper, the manufacturer and the importer. Anxin checks them against each other; it does not issue test reports, safety data sheets or import certificates.

In Dalian, before the box is loaded

  • Customs packaging use-appraisal result for the dangerous goods packaging (with the maker's performance appraisal)
  • Container packing certificate signed by a certified packing inspector after supervised stuffing
  • Transport-condition classification report where applicable
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)
  • EU declaration of conformity and CE marking photo from the manufacturer

Carrier and voyage

  • Routing (Red Sea or Cape) and any war-risk surcharge stated on the booking
  • Condition statement: new, used, damaged/defective (SP376) or for recycling (SP377)
  • Consignee EORI and HS-level description to the ENS filer before loading

For the importer in Portugal

  • APA (SILiAmb) registration and management entity of the Portuguese producer
  • Label and QR-code status against the August 2026 and February 2027 dates
Two power-tool battery packs side by side
Before you book

One consistent file

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Dalian export filings, the carrier booking and the Portugal import papers. We compare all three before confirming space.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risk table for Dalian → Ponta Delgada

RiskWhereMitigationWho acts
Ice delays berthing in mid-winterNorthern Yellow Sea, Jan–FebExtra time before cut-off; schedule reconfirmedCarrier, monitored by Anxin
Heavy weather off South Africa on a Cape sailingCape of Good HopeCINS stuffing checksPacking site, checked by Anxin
ENS not filed and the box is refused at loadingLoading port, DalianEORI and house-bill data passed to the filer at bookingFiler (carrier / forwarder)
Storage system delivered without Annex V test fileBuyer in PortugalTest documentation confirmed before bookingManufacturer

Questions

Common questions on the Dalian → Ponta Delgada route

24 hours before the container is loaded in China, not before it reaches Ponta Delgada. Without it carriers do not load the box, and a filing without an EORI number is rejected.

Often: in September 2026, 57% of Asia–Mediterranean services used the Red Sea routing. Bab el-Mandeb was rated a SUBSTANTIAL threat by the JMIC on 24 September 2026, so we confirm each service's routing before booking.

Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.

References

Regulations and port sources cited

  1. Registo de Produtores de Produtos (Agência Portuguesa do Ambiente)
  2. Registo de Produtores: Baterias (apresentação, 30.01.2026) (Agência Portuguesa do Ambiente)
  3. Regulation (EU) 2023/1542 on batteries and waste batteries (ELI) (EUR-Lex / Publications Office of the EU)
  4. ICS2 Release 3: Prepare your business for sending goods to or via the EU by sea and inland waterways (European Commission, DG TAXUD (leaflet KP0423828ENN))
  5. Regulation (EU) 2023/1542 concerning batteries and waste batteries (Official Journal PDF) (EUR-Lex / Publications Office of the EU)
  6. JMIC Update 099 to Advisory Note (Joint Maritime Information Center (via UKMTO))
  7. Sea ice arrives: what are the impacts? (Bohai and northern Yellow Sea, winter 2021/22) (China Meteorological Administration (from China Natural Resources News))
  8. Export dangerous goods packaging inspection: service guide (Chinese) (General Administration of Customs of China (Lanzhou Customs service guide))

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Dalian
  5. 5ImportClearance at Ponta Delgada
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Dalian → Ponta Delgada

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Dalian → Ponta Delgada before any booking, and ask for missing battery documents first.

All destinations from Dalian · Portugal ports

A forklift loading goods into an open shipping container

Need Dalian → Ponta Delgada reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp