Asia – Southeast Asian seas
Typhoons and the winter monsoon set the pace on this short Southeast Asian route; smaller ports are often reached through a hub.
South & Southeast Asia · sea freight from Dalian
Dalian to Cagayan de Oro
Yellow Sea · East China Sea · Philippine Sea · Bohol Sea
From Dalian to Cagayan de Oro, cargo moves from Liaoning through Dalian's Dayaowan terminals, crosses the monsoon-driven seas of Southeast Asia, and is discharged at the port of Cagayan de Oro.
The Philippines adds an advance manifest due 24 or 48 hours before arrival. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
Typhoons and the winter monsoon set the pace on this short Southeast Asian route; smaller ports are often reached through a hub.
For the Philippines, the manifest comes early and only accredited importers can lodge entries.


Where this route gets difficult
They run from the Dalian terminal through the voyage to Cagayan de Oro and the Philippines import file.
The Bohai Sea and the northern Yellow Sea freeze every winter. For 2021/22 China's marine forecast centre expected floating ice around 15 nautical miles offshore in the northern Yellow Sea, where Dayaowan is, and around 60 in Liaodong Bay, with the peak between mid-January and mid-February.
What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.
Liaoning's first lithium battery export under JT/T 1543 sailed from Dayaowan on 4 May 2025, and Dalian MSA counted 885 TEU of lithium batteries exported in the first four months of that year. Carriers should not accept batteries that do not meet JT/T 1543, and with a thinner flow there are fewer sailings to fall back on if a booking is refused.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
PAGASA reports that about 20 tropical cyclones enter the Philippine Area of Responsibility each year, 8-9 of them crossing the islands. Ports such as Cagayan de Oro suspend operations when storm signals are raised, and inter-island feeder legs stop sailing, so a battery container can wait at a transhipment port as well as at Cagayan de Oro itself.
What Anxin does: In the typhoon months we ask the consignee to have its customs entry ready before arrival, so the container can leave Cagayan de Oro as soon as operations restart.
No import declaration can be lodged unless the importer is registered in the Bureau of Customs' CPRS and accredited. A first-time importer at Cagayan de Oro that has not finished this will see its battery container wait, and pay for the waiting.
What Anxin does: At quotation we ask a new importer to confirm its CPRS registration and accreditation before the first container is booked.
CAO 15-2020 gives consolidators a separate deadline: their manifest is due 24 or 12 hours before arrival, depending on the voyage. LCL battery cargo for Cagayan de Oro depends on the consolidator having the DG details in time.
What Anxin does: For LCL shipments we pass the DG data to the consolidator at booking, so its manifest is complete before the Philippine cut-off.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the Philippines import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Ice delays berthing in mid-winter | Northern Yellow Sea, Jan–Feb | Extra time before cut-off; schedule reconfirmed | Carrier, monitored by Anxin |
| Entry cannot be lodged for an unaccredited importer | Philippine port of discharge | Accreditation checked at quotation | Importer |
Questions
A February 2026 DTI draft would require PS or ICC marking with a 12-month transition; importers should follow it.
It waits or moves to the next vessel. The dangerous goods declaration has to be refiled for that vessel, which is why we check DG acceptance for a back-up sailing in typhoon months.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Cagayan de Oro before any booking, and ask for missing battery documents first.
All destinations from Dalian · Philippines ports

Share the cargo facts; we review the route in writing.
Request a Quote