Asia – Americas via the Panama Canal
A Pacific crossing, a Panama Canal transit that depends on lake levels, and a Caribbean passage in hurricane season.
Latin America & Caribbean · sea freight from Dalian
Dalian to Cartagena
Yellow Sea · Korea Strait · Sea of Japan · Tsugaru Strait · North Pacific · Eastern Pacific · Panama Canal · Caribbean Sea
From Dalian to Cartagena, cargo moves through Dayaowan, crosses the Pacific, the Panama Canal and the Caribbean, and is discharged at the port of Cartagena.
Colombia requires a customs agency above a threshold, a registration where a permit applies and SIC conformity for batteries. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
A Pacific crossing, a Panama Canal transit that depends on lake levels, and a Caribbean passage in hurricane season.
Colombia wants a clear filing route and, for batteries, joint conformity.


Where this route gets difficult
Loading port first, then the sea leg, then Cartagena and the Colombia market.
Dalian's battery flow is modest: Dalian MSA recorded 885 TEU of lithium battery exports in the first four months of 2025, and Liaoning's first export under JT/T 1543 left Dayaowan on 4 May 2025. Carriers should refuse batteries that fail JT/T 1543, and a thin flow leaves fewer alternative sailings when a booking is turned down.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
Sea fog is one of the main marine hazards of the Yellow and Bohai Seas according to the China Meteorological Administration, concentrated between April and July and with a serious effect on shipping. A vessel held at anchor by fog can arrive late enough to push a box beyond the sailing its documents name.
What Anxin does: In the fog season we avoid tight stuffing-to-cut-off gaps and keep the filing data ready to amend if the vessel changes.
The Atlantic hurricane season, covering the Caribbean and the Gulf of America, runs from 1 June to 30 November, peaking around 10 September, with an average of 14 named storms. Ports on the way to Cartagena close ahead of storms, and ships wait or divert.
What Anxin does: For August–October arrivals we build slack into delivery plans and pass the carrier's revised arrival straight to your consignee.
Colombia asks for an import registration through the VUCE only when a prior permit or approval applies. The agency for Cartagena confirms whether the product shipped from Dalian is affected.
What Anxin does: We ask the agency whether the tariff item shipped from Dalian needs a prior requirement.
Cartagena led Colombia's container ports in 2025 with 4.045 million TEU. A battery box for Cartagena is discharged at one of its terminals, which the carrier names.
What Anxin does: We ask the carrier which Cartagena terminal the box from Dalian uses.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Dalian export filings, the carrier booking and the Colombia import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Fog hold delays the vessel; filings need amending | Yellow Sea, Apr–Jul | Amendment-ready filing data | Anxin with the declarant |
| Hurricane closes ports or diverts the vessel | Caribbean / Gulf, Jun–Nov | Slack in delivery plan | Carrier / consignee |
Questions
Yes, where the battery regulation applies. The SIC checks the product and the batteries together and gives no partial approval.
1 June to 30 November, peaking around 10 September, according to the US National Hurricane Center.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Cartagena before any booking, and ask for missing battery documents first.
All destinations from Dalian · Colombia ports

Share the cargo facts; we review the route in writing.
Request a Quote