Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
North America · sea freight from Dalian
Dalian to Victoria
Yellow Sea · Korea Strait · Sea of Japan · Tsugaru Strait · North Pacific · Strait of Juan de Fuca
From Dalian to Victoria, cargo moves through Dayaowan, crosses a North Pacific corridor with no canal or chokepoint, and is discharged at the port of Victoria.
Canada adds an eManifest that closes 24 hours before loading and a CARM account that decides whether goods are released before duty is paid. This page sets out 5 points specific to this route, how Anxin handles each one and which documents to prepare.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
An eManifest filed 24 hours before loading, release-before-payment only with CARM security, and TDG conditions on the truck leg.


Where this route gets difficult
Loading port first, then the sea leg, then Victoria and the Canada market.
Dalian's battery flow is modest: Dalian MSA recorded 885 TEU of lithium battery exports in the first four months of 2025, and Liaoning's first export under JT/T 1543 left Dayaowan on 4 May 2025. Carriers should refuse batteries that fail JT/T 1543, and a thin flow leaves fewer alternative sailings when a booking is turned down.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
The Bohai Sea and the northern Yellow Sea freeze every winter. For 2021/22 China's marine forecast centre expected floating ice around 15 nautical miles offshore in the northern Yellow Sea, where Dayaowan is, and around 60 in Liaodong Bay, with the peak between mid-January and mid-February.
What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.
NOAA's Ocean Prediction Center has recorded hurricane-force winds (64 knots or more) in mid-latitude North Pacific storms in every month from October to April, most often in December, with 15 to 23 such storms a season in its 2001–2004 study. These are not tropical systems, so they arrive outside typhoon season.
What Anxin does: For October–April sailings we check blocking and bracing on stuffing photos before sealing and confirm the full DG data are on the manifest.
Canada accepts IMDG marking and documentation for the truck move out of Victoria (TDG s. 9.3), provided the shipping document is legible in English or French, gives a 24-hour number and the container is placarded under TDG Part 4 or the IMDG Code.
What Anxin does: We check that the DG declaration is in English, carries a 24-hour number that the consignee has arranged and matches the container's placards before the documents go to the Canadian trucker.
British Columbia's 2025 recycling amendments bring products that contain or use batteries of 5 kg or less, portable power stations and separately sold replacement batteries under producer responsibility. Producers must file an EPR plan by 15 December 2026 and run the program from 1 October 2027.
What Anxin does: For goods sold in British Columbia after landing at Victoria, we flag the 2026 plan deadline to the importer so the brand owner's EPR membership is settled before the program starts.

Documents & compliance
Test reports, safety data sheets and import certificates come from the shipper, factory and importer, not from Anxin; our part is to review them before booking.

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the Canada import file. We check the three against each other before the booking is confirmed.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Ice delays berthing in mid-winter | Northern Yellow Sea, Jan–Feb | Extra time before cut-off; schedule reconfirmed | Carrier, monitored by Anxin |
| Heavy-weather damage in a winter storm | North Pacific, Oct–Apr | CINS stuffing checks | Packing site, checked by Anxin |
Questions
Only if the importer is enrolled in release prior to payment with financial security posted in the CARM Client Portal. Since 20 May 2025, importers without security pay duties and taxes at release.
Weather is the main risk on this crossing: NOAA recorded hurricane-force North Pacific storms from October to April, most often in December. We tighten the packing checks for those sailings.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Victoria before any booking, and ask for missing battery documents first.
All destinations from Dalian · Canada ports

Share the cargo facts; we review the route in writing.
Request a Quote