Dalian (Dayaowan)
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
North America · sea freight from Dalian
Dalian to Charlottetown
Yellow Sea · Korea Strait · Tsugaru Strait · Eastern Pacific · Panama Canal · Caribbean Sea · Windward Passage · Cabot Strait
From Dalian to Charlottetown, cargo moves from Liaoning through Dalian's Dayaowan terminals, crosses a corridor into Atlantic Canada's waters, and is discharged at the port of Charlottetown.
Canada adds an eManifest that closes 24 hours before loading and a CARM account that decides whether goods are released before duty is paid. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.
What we need to start
Route profile
North-east China's battery gateway at Dayaowan, with a small but growing lithium export flow, a local MSA that has named misdeclaration as its main problem, and both winter ice and spring fog.
Container data due 24 hours before loading, CARM security for release before payment, and a road leg that accepts IMDG papers under Canadian conditions.


Where this route gets difficult
Loading port first, then the sea leg, then Charlottetown and the Canada market.
Liaoning's first lithium battery export under JT/T 1543 sailed from Dayaowan on 4 May 2025, and Dalian MSA counted 885 TEU of lithium batteries exported in the first four months of that year. Carriers should not accept batteries that do not meet JT/T 1543, and with a thinner flow there are fewer sailings to fall back on if a booking is refused.
What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.
The Bohai Sea and the northern Yellow Sea freeze every winter. For 2021/22 China's marine forecast centre expected floating ice around 15 nautical miles offshore in the northern Yellow Sea, where Dayaowan is, and around 60 in Liaodong Bay, with the peak between mid-January and mid-February.
What Anxin does: For January–February sailings from Dalian we allow extra time between stuffing and the DG cut-off and reconfirm the vessel schedule the week before loading.
NOAA's Ocean Prediction Center has logged hurricane-force mid-latitude storms in the North Atlantic from October to April, most frequently in January, on the last leg of the voyage to Charlottetown.
What Anxin does: For winter sailings we check blocking and bracing on stuffing photos before sealing.
Canada's consumer packaging rules require most mandatory label information on prepackaged consumer products in both English and French. Only the dealer's name and address may be in one language, and imported goods that do not state their origin need 'imported by / importé par' before it.
What Anxin does: For retail-packed goods going to Charlottetown, we check the carton and retail-box artwork for the bilingual text before production is packed.
Under s. 14 of the Canada Consumer Product Safety Act, an importer that learns of a health or safety incident involving a consumer product must tell Health Canada and its supplier within two days, and file a written report within ten. For battery products sold in Canada, the Chinese supplier's test and batch data are needed quickly.
What Anxin does: We make sure the importer has the manufacturer's contact, batch identifiers and test reports on file with each shipment, so an incident report can be made on time.

Documents & compliance
Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

A document that is present but inconsistent holds a booking as surely as a missing one: the UN number, model name or carton count reads differently in the Dalian export filings, the carrier booking and the Canada import papers. We compare all three before confirming space.
Carriers we book with
Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.
Risk & mitigation
| Risk | Where | Mitigation | Who acts |
|---|---|---|---|
| Ice delays berthing in mid-winter | Northern Yellow Sea, Jan–Feb | Extra time before cut-off; schedule reconfirmed | Carrier, monitored by Anxin |
| Stack damage in a winter storm | North Atlantic, Oct–Apr | CINS stuffing checks | Packing site, checked by Anxin |
Questions
Only if the importer is enrolled in release prior to payment with financial security posted in the CARM Client Portal. Since 20 May 2025, importers without security pay duties and taxes at release.
NOAA's storm study found hurricane-force winter storms from October to April, most often in January.
Sea ice forms every winter in the northern Yellow Sea; in 2021/22 it was forecast to reach about 15 nautical miles out there, peaking mid-January to mid-February. We plan extra time for those weeks.
References
Next step
Prefer chat? Chat on WhatsApp (+86 151 4514 5178)
We check carrier acceptance for Dalian → Charlottetown before any booking, and ask for missing battery documents first.
All destinations from Dalian · Canada ports

Share the cargo facts; we review the route in writing.
Request a Quote