Lithium battery freight focus Air · Sea · Land assessment Document-first planning

Oceania & Pacific · sea freight from Dalian

Shipping from Dalian to Fremantle

Dalian to Fremantle

Yellow Sea · East China Sea · Taiwan Strait · South China Sea · Sulu Sea · Celebes Sea · Makassar Strait · Lombok Strait

Sea corridor illustration: Dalian to Fremantle, Australia Simplified map with a curved corridor from Dalian via Yellow Sea, East China Sea, Taiwan Strait, South China Sea, Sulu Sea, Celebes Sea, Makassar Strait, Lombok Strait to Fremantle. Illustration only; not a vessel track or schedule. CHINAINDIAAUSTRALIAAFRICACENTRAL ASIAINDIAN OCEANNORTH PACIFICPACIFIC OCEANSOUTH PACIFIC Taiwan StraitLombok Strait DalianCHINA ORIGIN FremantleAUSTRALIA DalianBOHAI SEASHANDONGDEPARTURE AREA
  1. DalianChina origin
  2. Yellow Sea
  3. East China Sea
  4. Taiwan Strait
  5. South China Sea
  6. Sulu Sea
  7. Celebes Sea
  8. Makassar Strait
  9. Lombok Strait
  10. FremantleAustralia
Geographic corridor illustration only, not a vessel track, port-call list or sailing schedule. The loading terminal, carrier, transshipment and dates are confirmed per shipment.

Lithium batteries for Fremantle go through Dayaowan, where Liaoning's first JT/T 1543 lithium export sailed in May 2025. On the way they face a southward passage towards Oceania, and they arrive at the port of Fremantle.

On the Australian side the ABF, the biosecurity rules and the state port authority each want paperwork early. Below are 5 route-specific points to plan for, what we do about each, and the documents to have ready before booking.

What we need to start

  • Dalian Dayaowan export
  • Winter ice & spring fog
  • State DG notice
  • ICS cargo report
  • Packing declaration

Route profile

How Dalian → Fremantle differs from other lanes

Sea corridor

Asia – Australia, New Zealand & the Pacific Islands

A southward run towards Oceania, into Australia's November–April cyclone season and, for Australia, the BMSB season from September to April.

Import country

Australia

A sea cargo report 48 hours before arrival, a packing declaration with ISPM 15 timber, and state port rules for dangerous goods notice.

Blue harbour crane booms above a quay building in Dalian harbour
A loaded container ship on the horizon

Where this route gets difficult

5 pain points from Dalian to Fremantle

In the order the cargo meets them: at the loading port, at sea, at Fremantle and at customs in Australia.

  1. Origin port

    Fewer battery sailings from Dalian under JT/T 1543

    Dalian's battery flow is modest: Dalian MSA recorded 885 TEU of lithium battery exports in the first four months of 2025, and Liaoning's first export under JT/T 1543 left Dayaowan on 4 May 2025. Carriers should refuse batteries that fail JT/T 1543, and a thin flow leaves fewer alternative sailings when a booking is turned down.

    What Anxin does: We check JT/T 1543 conformity evidence with the manufacturer before booking and confirm the carrier's acceptance of the UN numbers in writing.

  2. Origin port

    Misdeclaration is the problem Dalian's MSA names first

    Dayaowan MSA reported in April 2024 that omissions and misdeclarations of lithium battery cargo were frequent because the rules are complex. Its answer was a dedicated desk and hotline, priority handling for EV batteries, and AI comparison of documents to cut down container openings: a comparison that flags any gap between the declaration and the paperwork behind it.

    What Anxin does: We reconcile the UN number, classification, packing group, quantity and SDS across every document before filing, which is exactly what an automated comparison will test.

  3. Sea corridor

    Makassar and Lombok: Indonesia's sea lane II

    Ships for Fremantle take the Makassar Strait and the Lombok Strait, the line of Indonesia's archipelagic sea lane II under IMO resolution MSC.72(69). It is a well-used route, but it keeps the ship in Indonesian waters for several days.

    What Anxin does: We make sure the DG declaration and emergency response information are complete and travel with the ship's documents for the whole voyage to Fremantle.

  4. Import country

    The sea cargo report is due 48 hours before arrival

    Australian Border Force requires the sea cargo report in the Integrated Cargo System at least 48 hours before the ship reaches its first Australian port on voyages of 48 hours or more, which covers every sailing from Dalian. If Fremantle is not the first port of call, the deadline runs from the earlier port.

    What Anxin does: We give the carrier and any NVOCC final house bill data at booking, so the cargo report for Fremantle is lodged on time and matches the DG declaration.

  5. Import country

    Fremantle Ports wants DG notice 48 hours ahead

    Fremantle Ports requires dangerous cargo to be notified through Voyager VDC at least 48 hours before the ship enters port waters or berths. On a ship from Dalian the carrier's agent files it for Fremantle from the DG data in the booking.

    What Anxin does: We give the carrier the UN number, class, packing group and quantity at booking so the Fremantle notification is not waiting on cargo details.

Locator map of Fremantle, AustraliaFremantle
Locator map in the same projection as the corridor map; the dot marks the listed port position (32.05°S, 115.75°E).
Red bow of a container ship under gantry cranes at the Port of Auckland

Documents & compliance

Checklist for Dalian → Fremantle

Anxin reviews documents supplied by the shipper, manufacturer and importer; it does not issue test reports, safety data sheets or import certificates.

Before loading in Dalian

  • UN number, class, quantity and SDS reconciled across all documents before the Dalian filing
  • JT/T 1543 conformity evidence from the manufacturer
  • Load plan showing even weight distribution (no more than 60% of the cargo weight in either half of the container length)
  • Signed packing declaration and ISPM 15 marks on timber
  • Safety data sheet and dangerous goods safe-carriage declaration for the MSA cargo report

For the carrier and the voyage

  • Transhipment port confirmed and shipped-on-board date on the bill of lading (BMSB season)
  • Dangerous goods declaration with UN number (3480 / 3481 / 3090 / 3091), proper shipping name and packing instruction (P903, or P908/P911 for damaged)
  • Lithium battery mark (SP188 cargo) or class 9 labels and placards

For the importer in Australia

  • Consumer products with button cells tested and packed to the ACCC standard
A shrink-wrapped lithium-ion battery pack for a small electric vehicle
Before you book

Send the file once, complete

Most delays on this route start with a document that exists but does not match: a UN number, a model name or a package count that differs between the Dalian filings, the carrier booking and the Australia import file. We check the three against each other before the booking is confirmed.

Carriers we book with

Our booking panel; availability on this lane and acceptance of the declared UN numbers are confirmed for each booking. It does not mean that a listed carrier runs a direct service on this route. Carrier choice depends on the trade lane, cargo classification and each carrier's dangerous-goods acceptance at booking. The final carrier is confirmed on the booking.

Risk & mitigation

Risk table for Dalian → Fremantle

RiskWhereMitigationWho acts
Declaration flagged by document comparison; container openedDayaowanCross-document reconciliation before filingAnxin with the declarant
Late cargo report delays releaseFirst Australian portHouse bill data sent earlyCarrier / NVOCC

Questions

Questions about shipping from Dalian to Fremantle

Through Voyager VDC, at least 48 hours before the ship enters port waters or berths.

South through the Makassar Strait and the Lombok Strait, along Indonesia's archipelagic sea lane II (IMO resolution MSC.72(69)).

Dayaowan MSA reported in 2024 that omissions and misdeclarations of lithium battery cargo were frequent because the rules are complex, and it uses AI document comparison. Consistent data across the declaration, SDS and packing documents is the main defence.

References

Official sources for this page

  1. ACN 2023/01: sea cargo reporting requirements and inspection arrangements (Australian Border Force)
  2. Products containing button and coin batteries mandatory safety standard (ACCC Product Safety Australia)
  3. ISPM 15: the international standard for solid wood packaging material (Department of Agriculture, Fisheries and Forestry)
  4. Packing declaration fact sheet (Department of Agriculture, Fisheries and Forestry)
  5. Dangerous cargo information (Fremantle Ports)
  6. Seasonal measures for Brown marmorated stink bug (BMSB) (Australian Department of Agriculture, Fisheries and Forestry)
  7. Resolution MSC.72(69): adoption, designation and substitution of archipelagic sea lanes (International Maritime Organization)

Next step

From enquiry to import

  1. 1EnquiryCargo, origin, destination
  2. 2Documents checkUN 38.3, SDS, packing
  3. 3BookingAfter carrier acceptance
  4. 4HandoverAt Dalian
  5. 5ImportClearance at Fremantle
Each step is confirmed in writing; an enquiry does not create a booking.

Ask about Dalian → Fremantle

Origin and destination are filled in; add the cargo facts you have.

Sending this form starts a review; it does not confirm carriage. Full enquiry form

After you send it

We check carrier acceptance for Dalian → Fremantle before any booking, and ask for missing battery documents first.

All destinations from Dalian · Australia ports

Workers loading cartons from pallets by hand in a warehouse

Need Dalian → Fremantle reviewed?

Share the cargo facts; we review the route in writing.

Request a Quote
Request a Quote WhatsApp